AGENT SKILL

completion-inspection

Execute KGS on-site completion inspection and permit issuance for gas terminal facilities (LNG/LPG/수소). Final verification of all safety systems, pressure testing, leak testing, and operational readiness before facility commissioning.

License 许可
AGPL-3.0
最近更新
2026-11-14
Stars
★ 25
Forks
9

01 前言 Front Matter

lang
ko
name
completion-inspection
owner
gasterm-agent
scope
co-safety
mirror
false
status
active
created
1783555200000
version
1.0.0
metadata
{ "type": "domain", "triggers": [ "completion inspection", "final inspection", "permit issuance", "완성검사", "최종검사", "사용전검사" ], "legal_basis": [ "고압가스 안전 관리 및 사업법 제22조의2 (기술검토), 제13조 (시설·용기의 안전유지)", "액화석유가스의 안전관리 및 사업법 제37조, 제45조 (검사 기준)", "도시가스사업법 제17조의5 (시설·기술·검사 기준)" ] }
description
Execute KGS on-site completion inspection and permit issuance for gas terminal facilities (LNG/LPG/수소). Final verification of all safety systems, pressure testing, leak testing, and operational readiness before facility commissioning.
lang_reason
legal
last_updated
1784246400000

03 SKILL.md 正文

audit_exception: safety-os-skill-structure — Safety OS skills use the legal_basis-gated SSOT skill format (validated by scripts/skill-lifecycle-audit.ts and scripts/validate-skills.ts), not the generic template 5-section/7-frontmatter schema

completion-inspection

Purpose

Execute Phase 3 of the KGS Code construction inspection: completion inspection and permit issuance for commissioning, populating evidence-models/domains/industry/gasterm/gasterm-completion-inspection-record.json.

Scope

  • Final safety system verification
  • Pressure testing and leak testing oversight
  • Safety device functional testing (안전밸브, 자동차단밸브 등)
  • Operational readiness assessment
  • 지자체 허가증 발급 및 운영 개시 절차

Legal Basis

Law Article Requirement
고압가스 안전 관리 및 사업법 Articles 22의2, 13 기술검토, 시설·용기의 안전유지
액화석유가스의 안전관리 및 사업법 Articles 37, 45 검사 기준
도시가스사업법 Article 17의5 시설·기술·검사 기준
KGS Code Section 5 Commissioning and Start-up

Prerequisites

  • Phase 2 (mid-construction-inspection) must have inspection_result == pass. Record the resulting record_id as mid_construction_inspection_id on this record.

Related Skills

  • construction-permit-overview — orchestrates this skill as Phase 3, gated on Phase 2 passed; this skill's inspection_result and permit_granted close out the overall lifecycle record.
  • mid-construction-inspection — upstream Phase 2 dependency.

Workflow

  1. Completion Inspection Application — After full construction completion, apply to KGS. Record mid_construction_inspection_id.
  2. Pre-Inspection Testing — Conduct 가스누출 시험, 압력시험, 전기식 안전장치 점검 ahead of KGS attendance. Record pressure_test_result (test_date, test_pressure_bar, holding_time_min, result) and leak_test_result (test_date, test_medium, result).
  3. KGS On-Site Completion Inspection — Full-facility comprehensive inspection with KGS 입회. Record kgs_inspector, inspection_date, and safety_device_test[] (each device with test_result).
  4. Deficiency Recording — For failed items, populate deficiencies[] (item, severity, corrective_action, reinspection_date).
  5. Corrective Action / Re-inspection (if needed) — Remediate and re-inspect critical/major deficiencies before proceeding to permit issuance.
  6. Result Recording — Set inspection_result: pass / supplement_required / fail.
  7. Permit Issuance — On pass, local_government issues the 변경허가 completion; record permit_granted = true, permit_granted_date, permit_number.
  8. Operation Start — Confirm safety_manager_appointed (안전관리자 선임), record operation_start_date and next_periodic_inspection_date (annual KGS periodic inspection cadence — hands off to routine gasterm inspection-record tracking).
  9. Closure — Return record_id to the orchestrating construction-permit-overview record's phases.completion.result_id; set that record's overall_status = completed when permit_granted == true.

Inputs

  • Mid-construction inspection clearance (Phase 2 pass record)
  • Pressure test reports
  • Leak test results
  • Safety device test results

Outputs

gasterm-completion-inspection-record.json-conformant record including:

  • pressure_test_result, leak_test_result, safety_device_test[], deficiencies[], inspection_result
  • permit_granted, permit_granted_date, permit_number, operation_start_date, next_periodic_inspection_date
  • legal_basis (>= 3 sources, drawn from the table above)

04 同仓库更多 Skills

5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25