completion-inspection
Execute KGS on-site completion inspection and permit issuance for gas terminal facilities (LNG/LPG/수소). Final verification of all safety systems, pressure testing, leak testing, and operational readiness before facility commissioning.
- License 许可
- AGPL-3.0
- 最近更新
- 2026-11-14
- Stars
- ★ 25
- Forks
- 9
01 前言 Front Matter
- lang
- ko
- name
- completion-inspection
- owner
- gasterm-agent
- scope
- co-safety
- mirror
- false
- status
- active
- created
- 1783555200000
- version
- 1.0.0
- metadata
- { "type": "domain", "triggers": [ "completion inspection", "final inspection", "permit issuance", "완성검사", "최종검사", "사용전검사" ], "legal_basis": [ "고압가스 안전 관리 및 사업법 제22조의2 (기술검토), 제13조 (시설·용기의 안전유지)", "액화석유가스의 안전관리 및 사업법 제37조, 제45조 (검사 기준)", "도시가스사업법 제17조의5 (시설·기술·검사 기준)" ] }
- description
- Execute KGS on-site completion inspection and permit issuance for gas terminal facilities (LNG/LPG/수소). Final verification of all safety systems, pressure testing, leak testing, and operational readiness before facility commissioning.
- lang_reason
- legal
- last_updated
- 1784246400000
03 SKILL.md 正文
audit_exception: safety-os-skill-structure — Safety OS skills use the legal_basis-gated SSOT skill format (validated by scripts/skill-lifecycle-audit.ts and scripts/validate-skills.ts), not the generic template 5-section/7-frontmatter schema
completion-inspection
Purpose
Execute Phase 3 of the KGS Code construction inspection: completion inspection and permit issuance for commissioning, populating evidence-models/domains/industry/gasterm/gasterm-completion-inspection-record.json.
Scope
- Final safety system verification
- Pressure testing and leak testing oversight
- Safety device functional testing (안전밸브, 자동차단밸브 등)
- Operational readiness assessment
- 지자체 허가증 발급 및 운영 개시 절차
Legal Basis
| Law | Article | Requirement |
|---|---|---|
| 고압가스 안전 관리 및 사업법 | Articles 22의2, 13 | 기술검토, 시설·용기의 안전유지 |
| 액화석유가스의 안전관리 및 사업법 | Articles 37, 45 | 검사 기준 |
| 도시가스사업법 | Article 17의5 | 시설·기술·검사 기준 |
| KGS Code | Section 5 | Commissioning and Start-up |
Prerequisites
- Phase 2 (
mid-construction-inspection) must haveinspection_result == pass. Record the resultingrecord_idasmid_construction_inspection_idon this record.
Related Skills
construction-permit-overview— orchestrates this skill as Phase 3, gated on Phase 2passed; this skill'sinspection_resultandpermit_grantedclose out the overall lifecycle record.mid-construction-inspection— upstream Phase 2 dependency.
Workflow
- Completion Inspection Application — After full construction completion, apply to KGS. Record
mid_construction_inspection_id. - Pre-Inspection Testing — Conduct 가스누출 시험, 압력시험, 전기식 안전장치 점검 ahead of KGS attendance. Record
pressure_test_result(test_date,test_pressure_bar,holding_time_min,result) andleak_test_result(test_date,test_medium,result). - KGS On-Site Completion Inspection — Full-facility comprehensive inspection with KGS 입회. Record
kgs_inspector,inspection_date, andsafety_device_test[](each device withtest_result). - Deficiency Recording — For failed items, populate
deficiencies[](item,severity,corrective_action,reinspection_date). - Corrective Action / Re-inspection (if needed) — Remediate and re-inspect critical/major deficiencies before proceeding to permit issuance.
- Result Recording — Set
inspection_result:pass/supplement_required/fail. - Permit Issuance — On
pass,local_governmentissues the 변경허가 completion; recordpermit_granted = true,permit_granted_date,permit_number. - Operation Start — Confirm
safety_manager_appointed(안전관리자 선임), recordoperation_start_dateandnext_periodic_inspection_date(annual KGS periodic inspection cadence — hands off to routine gasterm inspection-record tracking). - Closure — Return
record_idto the orchestratingconstruction-permit-overviewrecord'sphases.completion.result_id; set that record'soverall_status = completedwhenpermit_granted == true.
Inputs
- Mid-construction inspection clearance (Phase 2 pass record)
- Pressure test reports
- Leak test results
- Safety device test results
Outputs
gasterm-completion-inspection-record.json-conformant record including:
pressure_test_result,leak_test_result,safety_device_test[],deficiencies[],inspection_resultpermit_granted,permit_granted_date,permit_number,operation_start_date,next_periodic_inspection_datelegal_basis(>= 3 sources, drawn from the table above)
04 同仓库更多 Skills
i18n-layout
Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.
i18n-layout
Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.
i18n-layout
Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.
i18n-layout
Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.
i18n-layout
Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.
i18n-layout
Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.