AGENT SKILL

org-readiness-assessment

Guides the Change Management Partner through diagnosing an organization's capacity to absorb and sustain change. Produces readiness scores, capability gap analysis, and change management cost estimates that support engagement budgeting.

License 许可
AGPL-3.0
最近更新
2026-11-14
Stars
★ 25
Forks
9

01 前言 Front Matter

name
org-readiness-assessment
owner
change-management-partner
scope
co-hr
status
active
version
1.0.1
metadata
{ "type": "domain", "triggers": [ "organizational readiness", "change readiness", "change capacity", "readiness assessment", "transformation readiness" ] }
capability
hr-org-readiness-assessment
relates_to
[ { "type": "follows", "skill": "labor-compliance-audit" }, { "type": "composes_with", "skill": "stakeholder-alignment" }, { "type": "composes_with", "skill": "talent-acquisition-strategy" }, { "type": "composes_with", "skill": "performance-system-design" } ]
description
Guides the Change Management Partner through diagnosing an organization's capacity to absorb and sustain change. Produces readiness scores, capability gap analysis, and change management cost estimates that support engagement budgeting.
last_reviewed
1791417600000
prerequisites
none
catalog-parity
skip

03 SKILL.md 正文

Context

Use in Phase 1 alongside compliance and workforce-statistics diagnosis. The change management cost estimates produced here support engagement budgeting rather than feeding a dedicated financial-modeling skill (co-hr has none).

When to Use

  • When beginning a consulting engagement that involves organizational transformation
  • Before budgeting an engagement that must account for change management costs
  • When leadership asks for a realistic assessment of the organization's change capacity
  • When resistance probability needs to be quantified for schedule planning

Execution Steps

  1. Define Change Scope: Clarify the nature and scale of the proposed change

  2. Leadership Alignment Assessment:

    • Are senior leaders aligned on the need for change? (Score 1-5)
    • Is there a visible, committed executive sponsor? (Score 1-5)
    • Are middle managers equipped to lead change? (Score 1-5)
  3. Cultural Readiness Assessment:

    • Does the organizational culture support experimentation and adaptation? (Score 1-5)
    • Are there past change failures that may create skepticism? (Yes/No + context)
    • What are the dominant cultural values and how do they align with the proposed change?
  4. Capability Gap Analysis:

    • What skills/competencies are required by the change?
    • What is the current capability level? (Gap = Required - Current)
    • What training or hiring is needed?
  5. Change Management Cost Estimation:

    • Training and upskilling cost range
    • Change agent/program management resource cost
    • Communication campaign budget
    • Schedule delay buffer (weeks × team cost, given resistance probability)
    • Total change management cost range (this estimate supports engagement budgeting)
  6. Overall Readiness Score: Weighted average across dimensions.

    • Low: < 3.0
    • Medium: 3.0–3.9
    • High: ≥ 4.0

Output Format

  • Readiness Scorecard: Dimension, Score (1-5), Key Evidence, Risk Flag
  • Capability Gap Table: Competency, Required Level, Current Level, Gap, Recommended Action
  • Change Management Cost Estimate: Category, Low Estimate, High Estimate, Assumptions
  • Overall Readiness Summary: Score, Interpretation, Top 3 Risks, Recommended Change Approach

Related Skills

  • stakeholder-alignment

04 同仓库更多 Skills

5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25
5throck
5throck/ai-workspace-standards

i18n-layout

Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.

★ 25