financial-modeling
Guides the Strategy Analyst through building a full business case for consulting recommendations. Covers ROI analysis, NPV/IRR/Payback Period calculation, scenario sensitivity analysis, and explicitly includes change management cost category. Designed to work iteratively with technical-feasibility (max 2 loops).
- License 许可
- AGPL-3.0
- 最近更新
- 2026-11-14
- Stars
- ★ 25
- Forks
- 9
01 前言 Front Matter
- name
- financial-modeling
- owner
- strategy-analyst
- scope
- co-consult
- inputs
- [ "complexity-grades", "readiness-scores", "change-mgmt-cost-estimates" ]
- status
- active
- outputs
- [ "roi-analysis", "npv-irr-payback", "business-case" ]
- version
- 1.0.1
- metadata
- { "type": "domain", "triggers": [ "financial model", "financial modeling", "business case", "ROI analysis", "NPV IRR", "investment justification" ] }
- relates_to
- [ { "type": "composes_with", "skill": "technical-feasibility" }, { "type": "enables", "skill": "executive-presentation" }, { "type": "follows", "skill": "insight-synthesis" }, { "type": "follows", "skill": "stakeholder-alignment" }, { "type": "composes_with", "skill": "financial-statement-analysis" }, { "type": "composes_with", "skill": "competitive-intelligence" } ]
- description
- Guides the Strategy Analyst through building a full business case for consulting recommendations. Covers ROI analysis, NPV/IRR/Payback Period calculation, scenario sensitivity analysis, and explicitly includes change management cost category. Designed to work iteratively with technical-feasibility (max 2 loops).
- last_reviewed
- 1787702400000
- prerequisites
- technical-feasibility, org-readiness-assessment
03 SKILL.md 正文
Context
Use in Phase 1-2 after technical-feasibility and org-readiness-assessment have produced outputs. Converts complexity grades and risk factors into a complete financial business case for client decision-making.
When to Use
- Building investment justification for a recommended solution
- Comparing financial impact of multiple strategic options
- Presenting business case to C-level stakeholders
Execution Steps
- Gather Inputs:
- Solution definition (from Engagement Leader brief)
technical-feasibilityoutputs: complexity grade, risk cost range lookup values, preconditionsorg-readiness-assessmentoutputs: change management cost estimates, training requirements- Baseline company financials (when available): consume a canonical financial model conforming to docs/market-data-schema.json — never re-key ad-hoc figures from disclosure PDFs ([CONSULT-R2])
- Build Cost Model:
- Implementation costs (use technical-feasibility complexity grade as basis)
- Change management costs (explicitly include — sourced from org-readiness-assessment):
- Training and capability building
- Change agent resourcing
- Schedule delay buffer for resistance
- Ongoing operational costs (year 1-3)
- Risk contingency (apply technical-feasibility cost range percentages)
- Build Benefit Model:
- Revenue uplift (quantified where possible)
- Cost reduction / efficiency gains
- Risk mitigation value
- Financial Metrics: Calculate NPV, IRR, Payback Period, ROI
- Scenario Analysis:
- Base case, optimistic, pessimistic
- Sensitivity table: top 3 variables that most impact NPV
- Iteration Protocol:
- Entry condition: Budget constraint confirmed mismatched with cost model
- Max iterations: 2 loops with technical-feasibility
- Exit condition: Cost range fits client budget OR Engagement Leader escalates to client after loop 2
- Output: Pass complete business case to
executive-presentation
Output Format
- Business Case Document: Executive Summary, Investment Overview, Cost Breakdown (incl. change management), Benefit Projections, NPV/IRR/Payback, Scenario Analysis, Recommendation
- Excel-compatible data table for sensitivity analysis
Related Skills
- technical-feasibility
- org-readiness-assessment
- insight-synthesis
- executive-presentation
04 同仓库更多 Skills
i18n-layout
Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.
i18n-layout
Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.
i18n-layout
Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.
i18n-layout
Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.
i18n-layout
Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.
i18n-layout
Text layout and encoding guidance: character encoding (UTF-8, legacy Korean code pages, BOM hazards), line endings, RTL/bidi handling, and script-specific font selection (Hangul focus). Use when: encoding is corrupted or mojibake appears, an RTL locale must render correctly, fonts must be chosen for a script, or CRLF/BOM issues surface.