Plan Sprint Skill

This skill creates sprint plans using a two-phase model:

  • Phase 1 — Roadmap: Batch planning. Multiple sprints can be planned in one session. Produces a lightweight sprint.md only (goals, scope, TODO references). No branches created.

  • Phase 2 — Detail: One sprint at a time. Produces full planning artifacts via the sprint-planner agent: a single sprint.md with right-sized Architecture and Use Cases sections (or, when the project has opted into the persistent design-doc set, a design/ overlay instead of the Architecture section — see "Design overlay opt-in check" below), plus tickets. Sizing is a three-tier decision (trivial / compact / substantial) — see the sprint-planner agent.md for the full criteria and how each tier handles diagrams and the architecture review gate (skipped for trivial, a scoped review for compact, the full review for substantial).

Branches are created later via acquire_execution_lock, not during planning. All planning happens on main.

Inputs

  • Stakeholder conversation describing the work to be done
  • docs/clasi/design/overview.md (must exist)

Critical Rules

DO NOT create tickets during roadmap mode or before the sprint has advanced to the ticketing phase. The create_ticket MCP tool will reject attempts before that phase.

DO NOT create a git branch during planning. Branches are created at execution time by acquire_execution_lock.

Issue Linkage

During the planning-docs phase (Phase 1, after create_sprint), call link_sprint_issues(sprint_id, issue_filenames) to associate issues with the sprint. This writes the issues: list in the sprint's frontmatter and updates each issue file's sprint: field. Do not write the issues: field manually via write_artifact_frontmatter.

The correct tool signature is: link_sprint_issues(sprint_id, issue_filenames)

Phase 1: Roadmap Mode

For batch roadmap planning of multiple sprints.

Process

  1. Determine sprint number: Check docs/clasi/sprints/ and docs/clasi/sprints/done/ for existing sprints. Next sequential number.

  2. Mine the TODO directory: Scan docs/clasi/todo/ for relevant ideas. Discuss with the stakeholder.

  3. Create sprint directory: Use the create_sprint MCP tool.

  4. Write sprint.md: Lightweight plan with:

    • Frontmatter: status: roadmap
    • Goals and feature scope
    • Issue references
    • No tickets, no architecture, no use cases
  5. Link issues: Call link_sprint_issues(sprint_id, issue_filenames) for each issue claimed by this sprint. Do not set issues: frontmatter manually.

  6. Repeat for additional sprints as needed.

Phase 2: Detail Mode

When a roadmap sprint is ready for execution. Invoke the sprint-planner agent via the Agent tool to fill in full planning artifacts.

Process

  1. Verify sprint exists: Sprint directory and roadmap sprint.md should already exist from Phase 1.

  2. Invoke sprint-planner agent: Use the Agent tool to dispatch the sprint-planner agent with:

    • Sprint ID and directory path
    • Sprint goals and TODO references
    • Path to docs/clasi/design/overview.md
    • Path to current architecture

    The sprint-planner handles architecture, architecture review, and ticket creation inline — no sub-dispatches needed.

    2a. Split partial-scope issues: If any issue in scope covers work that cannot all fit in this sprint, call split_issue first to carve out the in-scope piece as a separate issue file. The split issue will be a sibling of the original in the same directory. Then call create_ticket(issue=<split-filename>) to bring the in-scope piece into the sprint. The remainder stays in the pool or sprint for a future sprint.

    2b. Design overlay opt-in check: Read Project.design_docs_opt_in. - Unset or False: skip design-overlay steps entirely; the sprint-planner writes the Architecture section of sprint.md as it always has (Mode 2 of architecture-authoring). No design/ directory is created for this sprint. - True: after the sprint-planner makes its sizing decision (trivial / compact / substantial) and identifies which canonical docs/design/ doc(s) the sprint's changes affect (Mode 2a, Step 1 of architecture-authoring), it calls seed_sprint_design_overlay(sprint_id, doc_names) with those filenames. This is the sequencing resolution for where the seed-and-commit step fires: it happens here, during Phase 2 detail planning, once the affected docs are known — not at create_sprint (Phase 1), which runs before any sprint-planner analysis exists to name the affected docs. create_sprint itself never calls into the design-overlay machinery. The seed commit still lands on main, before acquire_execution_lock branches off it (sprint 021 Open Question 3's resolution), because Phase 2 entirely precedes acquire_execution_lock (step 4 below) — so the sprint branch, once created, already contains the seed commit. For a trivial-tier sprint, skip this call: no doc_names means no overlay, matching the "N/A — trivial" skip on the not-opted-in path. - The sprint-planner then edits the seeded copies, generates diffs, and validates, per architecture-authoring Mode 2a Steps 2-5, before architecture review runs.

  3. Stakeholder review: Present the completed plan to the stakeholder. Call review_sprint_pre_execution, which runs the sprint's precondition checks and, when opted in and the sprint carries a design/ overlay, additionally generates diffs (generate_diffs) and commits the edited overlay copies (commit_edits) as its final step — only after every other precondition has already passed. This is the commit that closes the git-dirty window Mode 2a's Step 3 opened: from here on, the sprint's design/ directory is clean until execution ends. Record stakeholder approval gate (record_gate_result).

  4. Acquire execution lock: Call acquire_execution_lock to claim the lock and create the sprint branch. Advance to executing. Because the edited-copy commit (step 3) already landed on main, the branch created here already contains it — no cross-branch reconciliation is needed.

  5. Set sprint status: Update sprint doc status to active.

Output

  • Sprint directory with full planning documents
  • Sprint branch created (via acquire_execution_lock)
  • Tickets in tickets/ ready for execution