conversion-optimization
When the user wants to improve conversion rates, run A/B tests, optimize funnels, or reduce friction. Also use when the user mentions "CRO", "conversion rate optimization", "A/B test" or "split test". For pricing psychology, use pricing-strategy.
- License 许可
- MIT
- 最近更新
- 2026-11-01
- Stars
- ★ 12
- Forks
- 0
01 前言 Front Matter
- name
- conversion-optimization
- metadata
- { "version": "1.1.1" }
- description
- When the user wants to improve conversion rates, run A/B tests, optimize funnels, or reduce friction. Also use when the user mentions "CRO", "conversion rate optimization", "A/B test" or "split test". For pricing psychology, use pricing-strategy.
03 SKILL.md 正文
Strategies: Conversion Optimization
Guides conversion rate optimization (CRO): increasing the percentage of visitors who complete desired actions. Higher conversion rates mean increased revenue, reduced CAC, and better ROI. Use this skill when optimizing funnels, running experiments, or reducing friction on high-traffic pages.
When invoking: On first use, if helpful, open with 1–2 sentences on what this skill covers and why it matters, then provide the main output. On subsequent use or when the user asks to skip, go directly to the main output.
Initial Assessment
Check for project context first: If .claude/project-context.md or .cursor/project-context.md exists, read Sections 4 (Audience), 5 (Website), 6 (Keywords).
Identify:
- Funnel stage: Awareness, consideration, decision, post-purchase
- Conversion goal: Signup, purchase, download, demo request
- Traffic: Volume; mobile vs desktop split
- Current conversion rate: Baseline for improvement
CRO Process
| Step | Action |
|---|---|
| 1. Research | Map funnel; identify high-traffic, low-conversion pages |
| 2. Hypothesize | Form testable hypothesis (if X, then Y because Z) |
| 3. Prioritize | Score by Potential, Importance, Ease (PIE) |
| 4. Test | A/B or multivariate; adequate sample size |
| 5. Analyze | Statistical significance; implement winner |
PIE Prioritization Framework
Score each test idea 1–10:
| Factor | Question |
|---|---|
| Potential | How much improvement is possible? |
| Importance | How much traffic does this page get? |
| Ease | How easy to implement? |
Rank backlog by total score; run highest-impact tests first.
A/B Testing Best Practices
| Practice | Guideline |
|---|---|
| Sample size | Calculate minimum before launch; 95% significance without adequate sample = false positives |
| Duration | Run full week cycles; account for day-of-week effects |
| One variable | Test one element per experiment (or use MVT for multiple) |
| Mobile separate | Mobile converts ~50% of desktop; test mobile independently—thumb reach, form complexity differ |
| Low traffic | Use Bayesian testing for faster, actionable results |
Key Testing Areas
| Page Type | Test Ideas |
|---|---|
| Homepage | Search bar prominence; personalized content; hero CTA; social proof placement |
| Landing page | Headline; form length; CTA copy; above-fold layout |
| Product/Category | Quick view; descriptions; add-to-cart placement |
| Checkout | Form fields; progress indicator; trust badges; guest checkout |
| Pricing | Plan order; anchoring; CTA per tier |
Personalization: Personalized experiences generate ~41% more impact than generic ones.
Commercialization Infrastructure
| Module | Purpose |
|---|---|
| Data & BI | Data warehouse; user behavior events; agile surveys |
| A/B testing | Experiment platform; statistical significance; backend-controlled variants |
| User education | Help docs (multi-language); update notifications; EDM |
| Attribution | Ad pixels; attribution model; impression-to-click-to-sale tracking |
Avoid: Intrusive interstitials; popups that block content. Prefer non-intrusive ad formats.
Foundational Requirements
- Analytics: Map funnels; identify drop-off points (analytics-tracking, traffic-analysis)
- Qualitative: Heatmaps, session recordings, user tests—understand why drop-off occurs
- Technical: Dedicated resources for 2–4 tests/month; maintain momentum
Output Format
- Funnel map (stages, conversion rates, drop-off)
- Hypothesis (if X, then Y because Z)
- Test plan (variant, metric, sample size, duration)
- Implementation checklist
Related Skills
- landing-page-generator: Landing page structure and copy
- cta-generator: CTA design and placement
- analytics-tracking: GA4, events, conversion tracking
- traffic-analysis: Attribution, funnel analysis
- copywriting: Headline, CTA copy for tests
04 同仓库更多 Skills
youtube
Download YouTube video transcripts when user provides a YouTube URL or asks to download/get/fetch a transcript from YouTube. Also use when user wants to transcribe or get captions/subtitles from a YouTube video.
write-plan
Use when you have a spec or requirements for a multi-step task, before touching code. Produces an engineering plan complete with TDD tasks, DRY/SOLID/YAGNI principles, a required Test Plan & Verification section, and a coverage target — then auto-runs /plan-eng-review as an independent double-check before execution.
worktrees
Use when starting feature work that needs isolation from current workspace or before executing implementation plans - creates isolated git worktrees with smart directory selection and safety verification
web-perf
Analyzes web performance using Chrome DevTools MCP. Measures Core Web Vitals (LCP, INP, CLS) and supplementary metrics (FCP, TBT, Speed Index), identifies render-blocking resources, network dependency chains, layout shifts, caching issues, and accessibility gaps. Use when asked to audit, profile, debug, or optimize page load performance, Lighthouse scores, or site speed. Biases towards retrieval from current documentation over pre-trained knowledge.
verify
Use when about to claim work is complete, fixed, or passing, before committing or creating PRs - requires running verification commands and confirming output before making any success claims; evidence before assertions always
validate-idea
Validate a business idea using the minimalist entrepreneur framework. Use when someone has a business idea and wants to test if it's worth pursuing before building anything.