[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"skill:01M7132QVS0SQSWBC2720V1PHM":3,"skill-same:01M7132QVS0SQSWBC2720V1PHM":67},{"skillNo":4,"name":5,"nameZh":6,"description":7,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":16,"categories":17,"keywords":18,"publishedAt":36,"linkOnly":37,"markdownContent":38,"markdownBody":39,"frontMatter":40,"refName":44,"commitSha":45,"skillDirectory":46,"forksCount":47,"repositoryHtmlUrl":48,"repositoryHomepageUrl":6,"ownerHtmlUrl":49,"ownerBlogUrl":50,"ownerDescription":51,"updatedAt":52,"install":53,"resources":66},"01M7132QVS0SQSWBC2720V1PHM","industrial-engineering-risk-assessment",null,"Identify, score and control the risks in work for manufacturing and service organisations in factories, warehouses and service operations.\nTRIGGERS - Use when a industrial engineer needs a risk assessment for manufacturing and service organisations in factories, warehouses and service operations.","lionelsimai\u002Fclaude-skills-collection","lionelsimai","https:\u002F\u002Favatars.githubusercontent.com\u002Fu\u002F260158848?v=4","01M6CHZPS8G9TSB113TT0BBM6E","Lionel ","01M6CHZPXGW2SPE3BHQTGJ0S8J",38,"MIT","https:\u002F\u002Fgithub.com\u002Flionelsimai\u002Fclaude-skills-collection\u002Fblob\u002Fmain\u002Fskills\u002Findustrial-engineering-risk-assessment\u002FSKILL.md",[],[19,20,21,22,23,24,25,26,27,28,29,30,31,32,33,34,35],"risk","industrial engineering risk assessment","assessment","risk assessment","engineering","industrial engineering","service","manufacturing","operations","control","work","industrial engineer","when","use","triggers","engineer","for","2026-11-10 10:12:30",false,"---\nname: industrial-engineering-risk-assessment\ndescription: |\n  Identify, score and control the risks in work for manufacturing and service organisations in factories, warehouses and service operations.\n  TRIGGERS - Use when a industrial engineer needs a risk assessment for manufacturing and service organisations in factories, warehouses and service operations.\ncategory: Industrial Engineering\nlicense: MIT\nversion: 1.0\n---\n# Risk Assessment — Industrial Engineering\n\nIdentify, score and control the risks in work for manufacturing and service organisations in factories, warehouses and service operations. The deliverable is a risk assessment with likelihood\u002Fimpact scores, controls and owners.\nThis skill is written for a industrial engineer working with manufacturing and service organisations in factories, warehouses and service operations.\n\n## When to use\n- You are a industrial engineer preparing, delivering or reviewing this part of your work in factories, warehouses and service operations.\n- You need a defensible, repeatable approach that produces a risk assessment with likelihood\u002Fimpact scores, controls and owners.\n- A colleague, auditor or client asks how this was done and what evidence supports it.\n\n## Key Concepts\n| Term | Meaning |\n|------|---------|\n| Throughput | the rate at which a system produces output |\n| Bottleneck | the stage limiting a whole process's capacity |\n| Lean | a method focused on removing waste from processes |\n\n## Workflow\n1. **Step 1** - Map the activity step by step and list what could go wrong at each stage for manufacturing and service organisations and staff\n2. **Step 2** - Score each risk for likelihood and impact, giving special weight to changes disrupting production\n3. **Step 3** - For every high risk, define a control that removes, reduces or contains it, using simulation software where relevant\n4. **Step 4** - Record the assessment in process maps, assign an owner to each control, and set a review date\n5. **Step 5** - Brief everyone involved before work starts; stop and reassess if conditions in factories, warehouses and service operations change\n\n## Profession-Specific Components\n| Component | Details for Industrial Engineering |\n|-----------|-------------------------------|\n| Core documentation | process maps; time studies; layout designs; improvement reports |\n| Core tools & equipment | simulation software; data analysis tools; measurement devices; project trackers |\n| People involved | manufacturing and service organisations; the industrial engineer; colleagues and other services in factories, warehouses and service operations |\n| Primary record | process maps — keep it current, dated and attributable |\n\n## Output Format\n**Context:** [Situation in factories, warehouses and service operations] | **Objective:** [What this must achieve] | **Audience:** [manufacturing and service organisations and other stakeholders]\n\nThe finished output is a risk assessment with likelihood\u002Fimpact scores, controls and owners, structured as:\n1. Summary of position and evidence\n2. Detail, following the workflow above\n3. Decisions, actions, owners and dates\n4. Review point and escalation route\n\n### Action Plan\n1. **Immediate:** Confirm scope, consent and the evidence available in process maps.\n2. **Short-term:** Complete the workflow steps and record outcomes against throughput improvement.\n3. **Medium-term:** Review results, close actions, and update local procedures in factories, warehouses and service operations.\n\n## Success Metrics\n| Metric | Target | Method |\n|--------|--------|--------|\n| throughput improvement | Agree a local target and track the trend | Measured from process maps and reviewed on a set cycle |\n| lead time reduction | Agree a local target and track the trend | Measured from process maps and reviewed on a set cycle |\n| quality rates | Agree a local target and track the trend | Measured from process maps and reviewed on a set cycle |\n| cost savings delivered | Agree a local target and track the trend | Measured from process maps and reviewed on a set cycle |\n\n## Guardrails & Quality Checks\n- Never let this happen: changes disrupting production.\n- Never let this happen: worker strain from poor design.\n- Never let this happen: unmeasured bottlenecks.\n- Work only within the competence and authority of a industrial engineer; escalate or refer anything beyond it.\n- Record facts and observations, not speculation, and keep records confidential to factories, warehouses and service operations's rules.\n- Verify names, dates, figures and measurements twice before anything is issued or signed off.\n- Use only real, verified information from the case in hand — never invent results, credentials or evidence.\n\n## Example (illustrative)\nA industrial engineer in factories, warehouses and service operations applies this workflow for manufacturing and service organisations: they open\nprocess maps, work through the five steps using simulation software, and close by recording\nthe outcome against throughput improvement and agreeing the next review date. (Illustrative example only —\nreplace with the real details of the case in hand.)\n","# Risk Assessment — Industrial Engineering\n\nIdentify, score and control the risks in work for manufacturing and service organisations in factories, warehouses and service operations. The deliverable is a risk assessment with likelihood\u002Fimpact scores, controls and owners.\nThis skill is written for a industrial engineer working with manufacturing and service organisations in factories, warehouses and service operations.\n\n## When to use\n- You are a industrial engineer preparing, delivering or reviewing this part of your work in factories, warehouses and service operations.\n- You need a defensible, repeatable approach that produces a risk assessment with likelihood\u002Fimpact scores, controls and owners.\n- A colleague, auditor or client asks how this was done and what evidence supports it.\n\n## Key Concepts\n| Term | Meaning |\n|------|---------|\n| Throughput | the rate at which a system produces output |\n| Bottleneck | the stage limiting a whole process's capacity |\n| Lean | a method focused on removing waste from processes |\n\n## Workflow\n1. **Step 1** - Map the activity step by step and list what could go wrong at each stage for manufacturing and service organisations and staff\n2. **Step 2** - Score each risk for likelihood and impact, giving special weight to changes disrupting production\n3. **Step 3** - For every high risk, define a control that removes, reduces or contains it, using simulation software where relevant\n4. **Step 4** - Record the assessment in process maps, assign an owner to each control, and set a review date\n5. **Step 5** - Brief everyone involved before work starts; stop and reassess if conditions in factories, warehouses and service operations change\n\n## Profession-Specific Components\n| Component | Details for Industrial Engineering |\n|-----------|-------------------------------|\n| Core documentation | process maps; time studies; layout designs; improvement reports |\n| Core tools & equipment | simulation software; data analysis tools; measurement devices; project trackers |\n| People involved | manufacturing and service organisations; the industrial engineer; colleagues and other services in factories, warehouses and service operations |\n| Primary record | process maps — keep it current, dated and attributable |\n\n## Output Format\n**Context:** [Situation in factories, warehouses and service operations] | **Objective:** [What this must achieve] | **Audience:** [manufacturing and service organisations and other stakeholders]\n\nThe finished output is a risk assessment with likelihood\u002Fimpact scores, controls and owners, structured as:\n1. Summary of position and evidence\n2. Detail, following the workflow above\n3. Decisions, actions, owners and dates\n4. Review point and escalation route\n\n### Action Plan\n1. **Immediate:** Confirm scope, consent and the evidence available in process maps.\n2. **Short-term:** Complete the workflow steps and record outcomes against throughput improvement.\n3. **Medium-term:** Review results, close actions, and update local procedures in factories, warehouses and service operations.\n\n## Success Metrics\n| Metric | Target | Method |\n|--------|--------|--------|\n| throughput improvement | Agree a local target and track the trend | Measured from process maps and reviewed on a set cycle |\n| lead time reduction | Agree a local target and track the trend | Measured from process maps and reviewed on a set cycle |\n| quality rates | Agree a local target and track the trend | Measured from process maps and reviewed on a set cycle |\n| cost savings delivered | Agree a local target and track the trend | Measured from process maps and reviewed on a set cycle |\n\n## Guardrails & Quality Checks\n- Never let this happen: changes disrupting production.\n- Never let this happen: worker strain from poor design.\n- Never let this happen: unmeasured bottlenecks.\n- Work only within the competence and authority of a industrial engineer; escalate or refer anything beyond it.\n- Record facts and observations, not speculation, and keep records confidential to factories, warehouses and service operations's rules.\n- Verify names, dates, figures and measurements twice before anything is issued or signed off.\n- Use only real, verified information from the case in hand — never invent results, credentials or evidence.\n\n## Example (illustrative)\nA industrial engineer in factories, warehouses and service operations applies this workflow for manufacturing and service organisations: they open\nprocess maps, work through the five steps using simulation software, and close by recording\nthe outcome against throughput improvement and agreeing the next review date. (Illustrative example only —\nreplace with the real details of the case in hand.)\n",{"name":5,"license":15,"version":41,"category":42,"description":43},1,"Industrial Engineering","Identify, score and control the risks in work for manufacturing and service organisations in factories, warehouses and service operations.\nTRIGGERS - Use when a industrial engineer needs a risk assessment for manufacturing and service organisations in factories, warehouses and service operations.\n","main","c605eae5729892d78c0b76dfdd58d3533bb26a91","skills\u002Findustrial-engineering-risk-assessment",5,"https:\u002F\u002Fgithub.com\u002Flionelsimai\u002Fclaude-skills-collection","https:\u002F\u002Fgithub.com\u002Flionelsimai","www.theaicapitol.com","Founder at The AI Capitol | I help founders turn AI into 10X revenue through systems, not tools. Ex-Apple • Ex-TikTok 👉 http:\u002F\u002Flionelsim.substack.com","2026-11-09 07:48:48",{"source":8,"skillName":5,"commands":54,"prompt":64,"zipAvailable":65},[55,58,61],{"tool":56,"command":57},"npx","npx skills add lionelsimai\u002Fclaude-skills-collection --skill industrial-engineering-risk-assessment",{"tool":59,"command":60},"bunx","bunx skills add lionelsimai\u002Fclaude-skills-collection --skill industrial-engineering-risk-assessment",{"tool":62,"command":63},"pnpm","pnpm dlx skills add lionelsimai\u002Fclaude-skills-collection --skill industrial-engineering-risk-assessment","安装技能，技能地址：https:\u002F\u002Fgithub.com\u002Flionelsimai\u002Fclaude-skills-collection\u002Fblob\u002Fmain\u002Fskills\u002Findustrial-engineering-risk-assessment\u002FSKILL.md",true,[],[68,76,83,90,97,104],{"skillNo":69,"name":70,"nameZh":6,"description":71,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":72,"categories":73,"keywords":74,"publishedAt":75},"01M72JZQ95YCSXV9YDQGP0SRCW","commercial-piloting-troubleshooting-guide","Diagnose and resolve common problems a commercial pilot meets in cockpits and flight operations.\nTRIGGERS - Use when a commercial pilot needs a troubleshooting & problem solving for airlines, passengers and cargo customers in cockpits and flight operations.","https:\u002F\u002Fgithub.com\u002Flionelsimai\u002Fclaude-skills-collection\u002Fblob\u002Fmain\u002Fskills\u002Fcommercial-piloting-troubleshooting-guide\u002FSKILL.md",[],[],"2026-11-10 22:39:42",{"skillNo":77,"name":78,"nameZh":6,"description":79,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":80,"categories":81,"keywords":82,"publishedAt":75},"01M72JZMFHP0Y2FKSKEAT2Y97Y","commercial-piloting-tools-equipment-checklist","Select, check and maintain the tools and equipment a commercial pilot relies on.\nTRIGGERS - Use when a commercial pilot needs a tools & equipment checklist for airlines, passengers and cargo customers in cockpits and flight operations.","https:\u002F\u002Fgithub.com\u002Flionelsimai\u002Fclaude-skills-collection\u002Fblob\u002Fmain\u002Fskills\u002Fcommercial-piloting-tools-equipment-checklist\u002FSKILL.md",[],[],{"skillNo":84,"name":85,"nameZh":6,"description":86,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":87,"categories":88,"keywords":89,"publishedAt":75},"01M72JZHMXR147J9D2R9NPS45X","commercial-piloting-supplies-procurement","Specify, source and manage the supplies and materials used in cockpits and flight operations.\nTRIGGERS - Use when a commercial pilot needs a supplies & procurement for airlines, passengers and cargo customers in cockpits and flight operations.","https:\u002F\u002Fgithub.com\u002Flionelsimai\u002Fclaude-skills-collection\u002Fblob\u002Fmain\u002Fskills\u002Fcommercial-piloting-supplies-procurement\u002FSKILL.md",[],[],{"skillNo":91,"name":92,"nameZh":6,"description":93,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":94,"categories":95,"keywords":96,"publishedAt":75},"01M72JZE4K4EFXAPV2GJRMKXR8","commercial-piloting-stakeholder-presentation","Present commercial pilot findings and proposals to decision-makers and stakeholders.\nTRIGGERS - Use when a commercial pilot needs a stakeholder presentation for airlines, passengers and cargo customers in cockpits and flight operations.","https:\u002F\u002Fgithub.com\u002Flionelsimai\u002Fclaude-skills-collection\u002Fblob\u002Fmain\u002Fskills\u002Fcommercial-piloting-stakeholder-presentation\u002FSKILL.md",[],[],{"skillNo":98,"name":99,"nameZh":6,"description":100,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":101,"categories":102,"keywords":103,"publishedAt":75},"01M72JZB450H80C1X56C57XE9W","commercial-piloting-session-delivery","Prepare for and deliver a professional session or appointment for airlines, passengers and cargo customers in cockpits and flight operations.\nTRIGGERS - Use when a commercial pilot needs a session delivery guide for airlines, passengers and cargo customers in cockpits and flight operations.","https:\u002F\u002Fgithub.com\u002Flionelsimai\u002Fclaude-skills-collection\u002Fblob\u002Fmain\u002Fskills\u002Fcommercial-piloting-session-delivery\u002FSKILL.md",[],[],{"skillNo":105,"name":106,"nameZh":6,"description":107,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":108,"categories":109,"keywords":110,"publishedAt":75},"01M72JZ7NTHR2NDVGVWR33C05H","commercial-piloting-service-plan","Design a realistic, measurable service plan for airlines, passengers and cargo customers as a commercial pilot.\nTRIGGERS - Use when a commercial pilot needs a service plan design for airlines, passengers and cargo customers in cockpits and flight operations.","https:\u002F\u002Fgithub.com\u002Flionelsimai\u002Fclaude-skills-collection\u002Fblob\u002Fmain\u002Fskills\u002Fcommercial-piloting-service-plan\u002FSKILL.md",[],[]]