[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"skill:01M70VY0F8VB85TN6KP3FKEFK3":3,"skill-same:01M70VY0F8VB85TN6KP3FKEFK3":69},{"skillNo":4,"name":5,"nameZh":6,"description":7,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":16,"categories":17,"keywords":18,"publishedAt":38,"linkOnly":39,"markdownContent":40,"markdownBody":41,"frontMatter":42,"refName":46,"commitSha":47,"skillDirectory":48,"forksCount":49,"repositoryHtmlUrl":50,"repositoryHomepageUrl":6,"ownerHtmlUrl":51,"ownerBlogUrl":52,"ownerDescription":53,"updatedAt":54,"install":55,"resources":68},"01M70VY0F8VB85TN6KP3FKEFK3","civil-engineering-tools-equipment-checklist",null,"Select, check and maintain the tools and equipment a civil engineer relies on.\nTRIGGERS - Use when a civil engineer needs a tools & equipment checklist for infrastructure clients, contractors and the public in engineering consultancies and construction sites.","lionelsimai\u002Fclaude-skills-collection","lionelsimai","https:\u002F\u002Favatars.githubusercontent.com\u002Fu\u002F260158848?v=4","01M6CHZPS8G9TSB113TT0BBM6E","Lionel ","01M6CHZPXGW2SPE3BHQTGJ0S8J",38,"MIT","https:\u002F\u002Fgithub.com\u002Flionelsimai\u002Fclaude-skills-collection\u002Fblob\u002Fmain\u002Fskills\u002Fcivil-engineering-tools-equipment-checklist\u002FSKILL.md",[],[19,20,21,22,23,24,25,26,27,28,29,30,31,32,33,34,35,36,37],"civil engineering","civil","checklist","engineering","Tools","civil engineering tools equipment checklist","infrastructure","public","civil engineer","clients","check","when","use","maintain","sites","triggers","engineer","select","for","2026-11-10 10:12:30",false,"---\nname: civil-engineering-tools-equipment-checklist\ndescription: |\n  Select, check and maintain the tools and equipment a civil engineer relies on.\n  TRIGGERS - Use when a civil engineer needs a tools & equipment checklist for infrastructure clients, contractors and the public in engineering consultancies and construction sites.\ncategory: Civil Engineering\nlicense: MIT\nversion: 1.0\n---\n# Tools & Equipment Checklist — Civil Engineering\n\nSelect, check and maintain the tools and equipment a civil engineer relies on. The deliverable is an equipment checklist with inspection points, maintenance dates and replacement triggers.\nThis skill is written for a civil engineer working with infrastructure clients, contractors and the public in engineering consultancies and construction sites.\n\n## When to use\n- You are a civil engineer preparing, delivering or reviewing this part of your work in engineering consultancies and construction sites.\n- You need a defensible, repeatable approach that produces an equipment checklist with inspection points, maintenance dates and replacement triggers.\n- A colleague, auditor or client asks how this was done and what evidence supports it.\n\n## Key Concepts\n| Term | Meaning |\n|------|---------|\n| BIM | building information modelling, a shared digital model of an asset |\n| Load path | the route forces take through a structure to the ground |\n| Specification | the detailed technical requirements for works or materials |\n\n## Workflow\n1. **Step 1** - List the essential kit for work in engineering consultancies and construction sites, centred on CAD and BIM software, with what each item is used for\n2. **Step 2** - Define pre-use checks: condition, calibration or charge status, cleanliness and safety features\n3. **Step 3** - Set maintenance and replacement intervals based on usage and manufacturer guidance, and log them against design calculations\n4. **Step 4** - Quarantine faulty items immediately — faulty kit is a direct route to structural failures\n5. **Step 5** - Review the kit list quarterly against the work actually done and retire or add items deliberately\n\n## Profession-Specific Components\n| Component | Details for Civil Engineering |\n|-----------|-------------------------------|\n| Core documentation | design calculations; site inspection reports; drawings and models; specifications |\n| Core tools & equipment | CAD and BIM software; surveying equipment; modelling software; project management tools |\n| People involved | infrastructure clients, contractors and the public; the civil engineer; colleagues and other services in engineering consultancies and construction sites |\n| Primary record | design calculations — keep it current, dated and attributable |\n\n## Output Format\n**Context:** [Situation in engineering consultancies and construction sites] | **Objective:** [What this must achieve] | **Audience:** [infrastructure clients, contractors and the public and other stakeholders]\n\nThe finished output is an equipment checklist with inspection points, maintenance dates and replacement triggers, structured as:\n1. Summary of position and evidence\n2. Detail, following the workflow above\n3. Decisions, actions, owners and dates\n4. Review point and escalation route\n\n### Action Plan\n1. **Immediate:** Confirm scope, consent and the evidence available in design calculations.\n2. **Short-term:** Complete the workflow steps and record outcomes against design review completion.\n3. **Medium-term:** Review results, close actions, and update local procedures in engineering consultancies and construction sites.\n\n## Success Metrics\n| Metric | Target | Method |\n|--------|--------|--------|\n| design review completion | Agree a local target and track the trend | Measured from design calculations and reviewed on a set cycle |\n| site defect rates | Agree a local target and track the trend | Measured from design calculations and reviewed on a set cycle |\n| project delivery times | Agree a local target and track the trend | Measured from design calculations and reviewed on a set cycle |\n| budget variance | Agree a local target and track the trend | Measured from design calculations and reviewed on a set cycle |\n\n## Guardrails & Quality Checks\n- Never let this happen: structural failures.\n- Never let this happen: design errors discovered late.\n- Never let this happen: site safety incidents.\n- Work only within the competence and authority of a civil engineer; escalate or refer anything beyond it.\n- Record facts and observations, not speculation, and keep records confidential to engineering consultancies and construction sites's rules.\n- Verify names, dates, figures and measurements twice before anything is issued or signed off.\n- Use only real, verified information from the case in hand — never invent results, credentials or evidence.\n\n## Example (illustrative)\nA civil engineer in engineering consultancies and construction sites applies this workflow for infrastructure clients, contractors and the public: they open\ndesign calculations, work through the five steps using CAD and BIM software, and close by recording\nthe outcome against design review completion and agreeing the next review date. (Illustrative example only —\nreplace with the real details of the case in hand.)\n","# Tools & Equipment Checklist — Civil Engineering\n\nSelect, check and maintain the tools and equipment a civil engineer relies on. The deliverable is an equipment checklist with inspection points, maintenance dates and replacement triggers.\nThis skill is written for a civil engineer working with infrastructure clients, contractors and the public in engineering consultancies and construction sites.\n\n## When to use\n- You are a civil engineer preparing, delivering or reviewing this part of your work in engineering consultancies and construction sites.\n- You need a defensible, repeatable approach that produces an equipment checklist with inspection points, maintenance dates and replacement triggers.\n- A colleague, auditor or client asks how this was done and what evidence supports it.\n\n## Key Concepts\n| Term | Meaning |\n|------|---------|\n| BIM | building information modelling, a shared digital model of an asset |\n| Load path | the route forces take through a structure to the ground |\n| Specification | the detailed technical requirements for works or materials |\n\n## Workflow\n1. **Step 1** - List the essential kit for work in engineering consultancies and construction sites, centred on CAD and BIM software, with what each item is used for\n2. **Step 2** - Define pre-use checks: condition, calibration or charge status, cleanliness and safety features\n3. **Step 3** - Set maintenance and replacement intervals based on usage and manufacturer guidance, and log them against design calculations\n4. **Step 4** - Quarantine faulty items immediately — faulty kit is a direct route to structural failures\n5. **Step 5** - Review the kit list quarterly against the work actually done and retire or add items deliberately\n\n## Profession-Specific Components\n| Component | Details for Civil Engineering |\n|-----------|-------------------------------|\n| Core documentation | design calculations; site inspection reports; drawings and models; specifications |\n| Core tools & equipment | CAD and BIM software; surveying equipment; modelling software; project management tools |\n| People involved | infrastructure clients, contractors and the public; the civil engineer; colleagues and other services in engineering consultancies and construction sites |\n| Primary record | design calculations — keep it current, dated and attributable |\n\n## Output Format\n**Context:** [Situation in engineering consultancies and construction sites] | **Objective:** [What this must achieve] | **Audience:** [infrastructure clients, contractors and the public and other stakeholders]\n\nThe finished output is an equipment checklist with inspection points, maintenance dates and replacement triggers, structured as:\n1. Summary of position and evidence\n2. Detail, following the workflow above\n3. Decisions, actions, owners and dates\n4. Review point and escalation route\n\n### Action Plan\n1. **Immediate:** Confirm scope, consent and the evidence available in design calculations.\n2. **Short-term:** Complete the workflow steps and record outcomes against design review completion.\n3. **Medium-term:** Review results, close actions, and update local procedures in engineering consultancies and construction sites.\n\n## Success Metrics\n| Metric | Target | Method |\n|--------|--------|--------|\n| design review completion | Agree a local target and track the trend | Measured from design calculations and reviewed on a set cycle |\n| site defect rates | Agree a local target and track the trend | Measured from design calculations and reviewed on a set cycle |\n| project delivery times | Agree a local target and track the trend | Measured from design calculations and reviewed on a set cycle |\n| budget variance | Agree a local target and track the trend | Measured from design calculations and reviewed on a set cycle |\n\n## Guardrails & Quality Checks\n- Never let this happen: structural failures.\n- Never let this happen: design errors discovered late.\n- Never let this happen: site safety incidents.\n- Work only within the competence and authority of a civil engineer; escalate or refer anything beyond it.\n- Record facts and observations, not speculation, and keep records confidential to engineering consultancies and construction sites's rules.\n- Verify names, dates, figures and measurements twice before anything is issued or signed off.\n- Use only real, verified information from the case in hand — never invent results, credentials or evidence.\n\n## Example (illustrative)\nA civil engineer in engineering consultancies and construction sites applies this workflow for infrastructure clients, contractors and the public: they open\ndesign calculations, work through the five steps using CAD and BIM software, and close by recording\nthe outcome against design review completion and agreeing the next review date. (Illustrative example only —\nreplace with the real details of the case in hand.)\n",{"name":5,"license":15,"version":43,"category":44,"description":45},1,"Civil Engineering","Select, check and maintain the tools and equipment a civil engineer relies on.\nTRIGGERS - Use when a civil engineer needs a tools & equipment checklist for infrastructure clients, contractors and the public in engineering consultancies and construction sites.\n","main","c605eae5729892d78c0b76dfdd58d3533bb26a91","skills\u002Fcivil-engineering-tools-equipment-checklist",5,"https:\u002F\u002Fgithub.com\u002Flionelsimai\u002Fclaude-skills-collection","https:\u002F\u002Fgithub.com\u002Flionelsimai","www.theaicapitol.com","Founder at The AI Capitol | I help founders turn AI into 10X revenue through systems, not tools. Ex-Apple • Ex-TikTok 👉 http:\u002F\u002Flionelsim.substack.com","2026-11-09 07:48:48",{"source":8,"skillName":5,"commands":56,"prompt":66,"zipAvailable":67},[57,60,63],{"tool":58,"command":59},"npx","npx skills add lionelsimai\u002Fclaude-skills-collection --skill civil-engineering-tools-equipment-checklist",{"tool":61,"command":62},"bunx","bunx skills add lionelsimai\u002Fclaude-skills-collection --skill civil-engineering-tools-equipment-checklist",{"tool":64,"command":65},"pnpm","pnpm dlx skills add lionelsimai\u002Fclaude-skills-collection --skill civil-engineering-tools-equipment-checklist","安装技能，技能地址：https:\u002F\u002Fgithub.com\u002Flionelsimai\u002Fclaude-skills-collection\u002Fblob\u002Fmain\u002Fskills\u002Fcivil-engineering-tools-equipment-checklist\u002FSKILL.md",true,[],[70,78,85,92,99,106],{"skillNo":71,"name":72,"nameZh":6,"description":73,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":74,"categories":75,"keywords":76,"publishedAt":77},"01M72JZQ95YCSXV9YDQGP0SRCW","commercial-piloting-troubleshooting-guide","Diagnose and resolve common problems a commercial pilot meets in cockpits and flight operations.\nTRIGGERS - Use when a commercial pilot needs a troubleshooting & problem solving for airlines, passengers and cargo customers in cockpits and flight operations.","https:\u002F\u002Fgithub.com\u002Flionelsimai\u002Fclaude-skills-collection\u002Fblob\u002Fmain\u002Fskills\u002Fcommercial-piloting-troubleshooting-guide\u002FSKILL.md",[],[],"2026-11-10 22:39:42",{"skillNo":79,"name":80,"nameZh":6,"description":81,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":82,"categories":83,"keywords":84,"publishedAt":77},"01M72JZMFHP0Y2FKSKEAT2Y97Y","commercial-piloting-tools-equipment-checklist","Select, check and maintain the tools and equipment a commercial pilot relies on.\nTRIGGERS - Use when a commercial pilot needs a tools & equipment checklist for airlines, passengers and cargo customers in cockpits and flight operations.","https:\u002F\u002Fgithub.com\u002Flionelsimai\u002Fclaude-skills-collection\u002Fblob\u002Fmain\u002Fskills\u002Fcommercial-piloting-tools-equipment-checklist\u002FSKILL.md",[],[],{"skillNo":86,"name":87,"nameZh":6,"description":88,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":89,"categories":90,"keywords":91,"publishedAt":77},"01M72JZHMXR147J9D2R9NPS45X","commercial-piloting-supplies-procurement","Specify, source and manage the supplies and materials used in cockpits and flight operations.\nTRIGGERS - Use when a commercial pilot needs a supplies & procurement for airlines, passengers and cargo customers in cockpits and flight operations.","https:\u002F\u002Fgithub.com\u002Flionelsimai\u002Fclaude-skills-collection\u002Fblob\u002Fmain\u002Fskills\u002Fcommercial-piloting-supplies-procurement\u002FSKILL.md",[],[],{"skillNo":93,"name":94,"nameZh":6,"description":95,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":96,"categories":97,"keywords":98,"publishedAt":77},"01M72JZE4K4EFXAPV2GJRMKXR8","commercial-piloting-stakeholder-presentation","Present commercial pilot findings and proposals to decision-makers and stakeholders.\nTRIGGERS - Use when a commercial pilot needs a stakeholder presentation for airlines, passengers and cargo customers in cockpits and flight operations.","https:\u002F\u002Fgithub.com\u002Flionelsimai\u002Fclaude-skills-collection\u002Fblob\u002Fmain\u002Fskills\u002Fcommercial-piloting-stakeholder-presentation\u002FSKILL.md",[],[],{"skillNo":100,"name":101,"nameZh":6,"description":102,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":103,"categories":104,"keywords":105,"publishedAt":77},"01M72JZB450H80C1X56C57XE9W","commercial-piloting-session-delivery","Prepare for and deliver a professional session or appointment for airlines, passengers and cargo customers in cockpits and flight operations.\nTRIGGERS - Use when a commercial pilot needs a session delivery guide for airlines, passengers and cargo customers in cockpits and flight operations.","https:\u002F\u002Fgithub.com\u002Flionelsimai\u002Fclaude-skills-collection\u002Fblob\u002Fmain\u002Fskills\u002Fcommercial-piloting-session-delivery\u002FSKILL.md",[],[],{"skillNo":107,"name":108,"nameZh":6,"description":109,"descriptionZh":6,"repositoryFullName":8,"ownerLogin":9,"ownerAvatarUrl":10,"ownerAccountNo":11,"ownerDisplayName":12,"repositoryNo":13,"starsCount":14,"licenseSpdxId":15,"licenseFileUrl":6,"sourceHtmlUrl":110,"categories":111,"keywords":112,"publishedAt":77},"01M72JZ7NTHR2NDVGVWR33C05H","commercial-piloting-service-plan","Design a realistic, measurable service plan for airlines, passengers and cargo customers as a commercial pilot.\nTRIGGERS - Use when a commercial pilot needs a service plan design for airlines, passengers and cargo customers in cockpits and flight operations.","https:\u002F\u002Fgithub.com\u002Flionelsimai\u002Fclaude-skills-collection\u002Fblob\u002Fmain\u002Fskills\u002Fcommercial-piloting-service-plan\u002FSKILL.md",[],[]]