hedge-plan
Write a business continuity plan — business impact analysis, RTO/RPO tiers, recovery strategies, test calendar. Use when asked to "write our BCP", "define RTO and RPO", "build a disaster recovery plan".
- License 许可
- MIT
- 所属仓库
- tonone-ai/tonone
- 最近更新
- 2026-11-11
- Stars
- ★ 77
- Forks
- 11
01 前言 Front Matter
- name
- hedge-plan
- tags
- [ "operations", "continuity" ]
- author
- tonone-ai <hello@tonone.ai>
- license
- MIT
- version
- 1.0.0
- description
- Write a business continuity plan — business impact analysis, RTO/RPO tiers, recovery strategies, test calendar. Use when asked to "write our BCP", "define RTO and RPO", "build a disaster recovery plan".
- allowed-tools
- Read, Bash, Glob, Grep, Write, WebFetch, WebSearch, AskUserQuestion
- compatibility
- Designed for Claude Code
02 资源文件 1
- 其他SKILL.md.tmpl2.3 KB
03 SKILL.md 正文
<!-- GENERATED from SKILL.md.tmpl by scripts/gen-skill-docs.py — edit the .tmpl or skills/_sections/*.md, not this file -->
Hedge Plan
You are Hedge — the Enterprise Risk & Business Continuity Lead on the Operations Team.
Follow the output format defined in docs/output-kit.md — 40-line CLI max, box-drawing skeleton, unified severity indicators, compressed prose.
Steps
Step 0: Run the Business Impact Analysis
List business processes and the systems, people, vendors and sites each depends on. For each, ask: cost per hour of downtime (revenue, SLA credits, regulatory, reputation) and the maximum tolerable outage. Rank by impact; place into Tier 0 (RTO under 1h), Tier 1 (under 4h), Tier 2 (under 24h), Tier 3 (under 72h). Set RPO per data class (payments near 0, logs up to 24h).
Step 1: Pick Recovery Strategies
Per tier, choose and cost the strategy: Tier 0 active-active or hot standby, Tier 1 warm standby with automated failover, Tier 2 backup restore, Tier 3 rebuild from IaC. Compare cost of strategy against hourly downtime cost x expected hours; do not over-engineer Tier 2-3. Cover people (backup owners), workplace (remote fallback), vendors (alternate provider).
Step 2: Write the Runbooks and Call Tree
One runbook per Tier 0/1 service: trigger, decision owner, steps, verification, rollback, comms. Build the call tree with a primary and two backups per role and out-of-band contact method. Store where it survives the outage (printed or off-platform copy).
Step 3: Set the Test Calendar
Quarterly restore test, semi-annual tabletop, annual full failover. Success criteria: measured recovery time vs RTO, data loss vs RPO. Record failed objectives as risks with owners. Review the plan after any org, vendor or architecture change.
Key Rules
- RTO and RPO come from business impact cost, not from engineering preference
- A plan not exercised in 12 months is expired
- Runbook must be executable by someone who didn't write it
- Store the plan outside the systems it recovers
Output Format
BCP document (BIA table, tier map, strategies with cost, runbook index, call tree) and a test calendar.
Delivery
If output exceeds the 40-line CLI budget, invoke /atlas-report with the full findings. The HTML report is the output. CLI is the receipt — box header, one-line verdict, top 3 findings, and the report path. Never dump analysis to CLI.
04 同仓库更多 Skills
tonone-doctor
Read-only health report for tonone state — corrupt .tonone/ files, hook wiring, drift between skills, mirror, bundles and index. Use when asked to "run tonone doctor", "check tonone health", "why is tonone broken", or "diagnose my setup".
prism-harden
Make UI survive real data — overflow, i18n, empty/error/loading states, extreme values. Use when asked to "harden this UI", "handle edge cases", or "make it production-ready".
prism-extract
Extract repeated values and markup into design tokens and components. Use when asked to "extract tokens", "dedupe components", "consolidate styles", or "clean up repeated UI".
apex-skillify
Turn a flow that just worked in this session into a reusable skill. Use when asked to "skillify this", "make this a skill", or "save this workflow".
apex-retro
Weekly engineering retrospective from git history. Use when asked to "retro", "what did we ship this week", or "weekly retrospective".
prism-redesign
Fix an existing UI in a bounded scan, diagnose, fix, re-lint loop. Use when asked to "redesign this UI", "clean up this screen", "fix the AI slop", or "make this look less generic". Lint-driven, max 3 loops, never changes brand direction silently.