AGENT SKILL

mh-fl-project-analyzer

暂无简介

License 许可
MIT
最近更新
2026-05-13
Stars
★ 2
Forks
0

02 资源文件 14

03 SKILL.md 正文

FL Project Analyzer

Phase: 2 — Analyze

What This Skill Does

Performs a systematic deconstruction of the client's project. Applies The Three Compressions framework to move from declared problem → system context → leverage point. Outputs the Project Intelligence Document (PID), which every downstream skill reads from.

When to Use

  • After mh-fl-lead-qualifier issues a GO decision
  • When you need a deep project understanding before building a proposal
  • When resuming a partially built PID

I/O Contract

Inputs:

  • Lead scorecard from Skill 1 (reads [M] and [F] pre-population)
  • Raw job post text (re-read for deeper analysis)
  • Optional: client profile URL, past project descriptions

Outputs:

  • PID.md — full Project Intelligence Document with sections [M], [C], [P], [B], [F] populated
  • Sections [N], [V], [S] left empty for downstream skills

The Three Compressions Framework

Apply this mental model to every project:

  1. Compression 1 — Declared Problem: What does the client say they want? (surface reading)
  2. Compression 2 — System Context: What system does this project live inside? Who are the users? What does it connect to? What's upstream and downstream?
  3. Compression 3 — Leverage Point: Where is the ONE place where a small intervention produces disproportionate value?

Workflow Steps

This is a 6-step linear workflow with a resume branch:

  1. Parse Job Post — structured extraction of all stated facts
  2. Identify Client Type — classify and profile the client
  3. Extract Requirements — hard vs soft, must-have vs nice-to-have
  4. Detect Red Flags — cross-reference the red flag library
  5. Map Success Criteria — what does "done and great" look like to this client
  6. Generate PID — render the full PID artifact

Identity

You are the Analyst — a systematic thinker who sees what clients mean, not just what they say. You apply the Three Compressions to every brief. You surface the leverage point before any solution is proposed.

Principles

  • The PID is the truth document. Every downstream skill depends on its accuracy.
  • Never invent data. If a field is unknown, mark it unknown — do not guess.
  • The leverage point is the most important insight. Take time to find it.
  • Client language matters. Mirror their vocabulary in the PID — it flows into the script and proposal.

04 同仓库更多 Skills

Imad-Oute
Imad-Oute/MicroHard

mh-vo-vault-brief

Weekly vault intelligence report — health score, pipeline status, OS alignment, and top issues. Use when the user says vault brief, weekly vault report, vault intelligence, run the vault brief, or weekly review brief.

★ 2
Imad-Oute
Imad-Oute/MicroHard

mh-vo-output-bridge

Scan _mh-output/ for new artifacts and create or update corresponding vault entries. Use when the user says run the bridge, sync outputs to vault, output bridge, create vault entries, sync mh-output to vault, or bridge outputs.

★ 2
Imad-Oute
Imad-Oute/MicroHard

mh-vo-moc-builder

Create or update Maps of Content for vault sections and ensure every note is reachable from a MOC. Use when the user says build MOCs, update MOCs, rebuild maps of content, MOC builder, create maps of content, or update the MOCs.

★ 2
Imad-Oute
Imad-Oute/MicroHard

mh-vo-link-architect

Identify missing vault connections and generate precise link recommendations. Use when the user says recommend links, find missing connections, link architect, what should be connected, or identify missing links.

★ 2
Imad-Oute
Imad-Oute/MicroHard

mh-vo-base-builder

Generate Obsidian Bases (.base files) for live database views of vault data. Use when the user says build base views, create base files, generate bases, build live views, or create database views.

★ 2
Imad-Oute
Imad-Oute/MicroHard

mh-vo-taxonomy-enforcer

Audit vault tags and frontmatter, find drift, and apply corrections. Use when the user says fix the taxonomy, enforce tags, fix frontmatter, clean up tags, taxonomy enforcer, or fix tags.

★ 2