AGENT SKILL

mh-cto-sdlc-launch-plan

暂无简介

License 许可
MIT
最近更新
2026-05-13
Stars
★ 2
Forks
0

02 资源文件 2

03 SKILL.md 正文

Launch Plan

Mode: ask-driven. Launch context — audience composition, rollout preference, feature flags, communication channels — cannot be derived from Phase 4-5 artifacts. Ask first, then produce.

Elite character: The first 24 hours after launch are the highest-density operational period. Every minute of ambiguity (who do I notify? what do I say? do we roll back or hold?) costs compounded damage. The launch plan makes these decisions in advance, when there is time to think, so they can be executed when there is not.

Step 1 — Load Context

Confirm present:

  • Release gate verdict (release-gate-verdict.md) — AUTHORIZED ✓ / ✗
  • Phase 1 stakeholder map (stakeholder-map.md) ✓ / ✗
  • Acceptance criteria (ac-*.md) — for communication substance ✓ / ✗

If gate verdict is BLOCKED: "Release gate is blocked. Resolve gate issues before launch planning." If gate verdict is CONDITIONAL: "Release gate is conditional. Launch plan must include named mitigations for conditional items."

Step 2 — Launch Pattern Selection

Ask:

"What is the launch pattern?

A — Discrete launch: Ship to all users on a specific date. Full feature availability day one. Typical for consumer products with announcement campaigns.

B — Continuous / staged rollout: Soft launch to a subset of users, expand gradually. Typical for B2B products, high-risk launches, or systems with capacity uncertainty.

C — Feature flag controlled: Launch infrastructure to 100% but gate feature visibility behind flags. Expand flag by user cohort or percentage. Typical when you need zero-downtime capability staging.

Which pattern, and why?"

Record the answer. The plan format adapts to the chosen pattern.

Step 3 — Audience Map

"Who needs to know about this launch, in what order, and through what channel?"

For each audience:

Audience What They Need to Know When Channel Owner
Internal team Full feature set, known limitations, support protocols Before go-live Internal memo / Slack {name}
Beta users / early access What changed, what's new, how to give feedback At launch Email / in-app {name}
General users What the product does, how to get started At launch or post-staged Email / announcement {name}
Support team Common questions, known issues, escalation path Before go-live Runbook / training {name}
Stakeholders / investors Milestone achievement, traction plan Within 24h of launch Update email {name}

If no stakeholder map exists: derive audiences from the user research and Phase 2 PRD context.

Step 4 — Communication Templates

For each audience, draft the launch communication substance:

Internal memo:

  • What shipped (feature list tied to acceptance criteria)
  • What is explicitly not in this release (out of scope — prevents support confusion)
  • Known limitations or rough edges
  • Support escalation path

User-facing announcement:

  • Lead with the user benefit, not the feature list
  • One clear call to action
  • Where to get help

Issue/incident communication template (pre-draft for the scenario where something goes wrong):

  • "We are aware of an issue affecting {area}. Our team is investigating and will provide an update within {N} minutes."
  • "The issue affecting {area} has been resolved. If you continue to experience problems, please {contact path}."

Step 5 — First 24 Hours Playbook

Time Action Owner Signal That Triggers Next Step
T-1h Final staging smoke test {name} All P0 paths green
T-0 Deploy to production {name} Deploy completes, health checks pass
T+0 Run post-deploy smoke tests {name} P0 smoke tests pass
T+15m Send internal comms {name} Internal memo sent
T+30m Monitor dashboards — first health window {name} Error rates, latency within baseline
T+1h Send user-facing announcement (if discrete launch) {name} Announcement sent
T+4h First monitoring review — check for slow degradation {name} Metrics still within baseline
T+24h Hypercare Day 1 summary {name} → Triggers /mh-cto-sdlc-hypercare

Rollback threshold: If at any point during T+0 to T+4h: error rate exceeds {N}% for {N} minutes, or any P0 acceptance criterion is failing for real users → initiate rollback. Decision authority: {named person or role}.

Step 6 — Write Output

Save to _mh-output/cto/sdlc/launch-plan/{YYYY-MM-DD}_{r###}_launch-plan.md:

# Launch Plan

**Product:** {name}
**Date:** {date}
**Pattern:** {Discrete / Staged / Feature-flag}
**Gate verdict:** AUTHORIZED {date}

---

## Audience Map

{Table from Step 3}

## Communication Templates

{From Step 4}

## First 24 Hours Playbook

{Table from Step 5}

## Rollback Threshold

{Condition and decision authority}

## Conditional Items (from gate verdict)

{Any conditional mitigations that must be active during launch}

Step 7 — Present Summary

Launch Plan complete.

Pattern: {Discrete / Staged / Feature-flag} Audiences: {N} with sequenced communication plan. Rollback threshold: Defined — {N}% error rate or P0 failure → {named authority} calls it. First 24h playbook: {N} checkpoints.

Next step: Run /mh-cto-sdlc-go-live when ready to execute.

04 同仓库更多 Skills

Imad-Oute
Imad-Oute/MicroHard

mh-vo-vault-brief

Weekly vault intelligence report — health score, pipeline status, OS alignment, and top issues. Use when the user says vault brief, weekly vault report, vault intelligence, run the vault brief, or weekly review brief.

★ 2
Imad-Oute
Imad-Oute/MicroHard

mh-vo-output-bridge

Scan _mh-output/ for new artifacts and create or update corresponding vault entries. Use when the user says run the bridge, sync outputs to vault, output bridge, create vault entries, sync mh-output to vault, or bridge outputs.

★ 2
Imad-Oute
Imad-Oute/MicroHard

mh-vo-moc-builder

Create or update Maps of Content for vault sections and ensure every note is reachable from a MOC. Use when the user says build MOCs, update MOCs, rebuild maps of content, MOC builder, create maps of content, or update the MOCs.

★ 2
Imad-Oute
Imad-Oute/MicroHard

mh-vo-link-architect

Identify missing vault connections and generate precise link recommendations. Use when the user says recommend links, find missing connections, link architect, what should be connected, or identify missing links.

★ 2
Imad-Oute
Imad-Oute/MicroHard

mh-vo-base-builder

Generate Obsidian Bases (.base files) for live database views of vault data. Use when the user says build base views, create base files, generate bases, build live views, or create database views.

★ 2
Imad-Oute
Imad-Oute/MicroHard

mh-vo-taxonomy-enforcer

Audit vault tags and frontmatter, find drift, and apply corrections. Use when the user says fix the taxonomy, enforce tags, fix frontmatter, clean up tags, taxonomy enforcer, or fix tags.

★ 2