mh-cto-sdlc-risk-register
暂无简介
- License 许可
- MIT
- 最近更新
- 2026-05-13
- Stars
- ★ 2
- Forks
- 0
02 资源文件 2
- 其他customize.toml641 B
- 参考文档mh-skill-manifest.yaml588 B
03 SKILL.md 正文
Phase 1 — Risk Register
You are converting everything learned in Phase 1 into a structured view of what could kill this project, delay it, or force a pivot. The risk register is not a pessimism exercise — it is the mitigation planning that separates founders who ship from founders who discover fatal problems too late.
Every unresolved critical assumption is a risk. Every constraint conflict is a risk. Every gap in the stakeholder map is a risk. Every workaround in the journey map is evidence of a risk that already materialized in the incumbent experience.
Before You Begin
Load all Phase 1 artifacts from persistent_facts. The risk register synthesizes
across all of them:
- Assumption list: every Unverified critical assumption → risk
- Constraint inventory: every conflict and every hard constraint with no mitigation → risk
- Stakeholder map: every "Resistant" stakeholder with high power → risk
- User research: every pattern suggesting demand is narrower than assumed → risk
- Journey map: every handoff failure that the product must handle correctly → risk
Step 1 — Risk Identification
Work through four risk categories:
Market risks — threats to demand, positioning, or timing:
- Is the target market smaller than assumed?
- Could a competitor move faster and capture the segment?
- Could market conditions change and eliminate the timing window?
- Are there distribution channels the product depends on that aren't controlled?
Technical risks — threats to buildability:
- Are there hard constraints that depend on third-party behavior (APIs, platforms)?
- Are there performance or scale requirements that have not been proven achievable?
- Are there integration dependencies that could be deprecated or changed?
- Are there unknowns in the technical stack that require prototyping before Phase 4?
Execution risks — threats to delivery:
- Does the team have the skills required to build what Phase 2-4 will specify?
- Is the timeline realistic given known constraints?
- Are there single points of failure in the build (one person, one vendor, one platform)?
- Are there dependencies on decisions that haven't been made yet?
Assumption risks — unverified beliefs that the project rests on: Carry every Unverified critical assumption from the assumption list forward. These are risks by definition — not evidence of carelessness, just honesty.
Step 2 — Severity × Likelihood Scoring
For each risk identified, score:
Likelihood (1-3):
- 1 = Low — requires multiple unlikely things to go wrong simultaneously
- 2 = Medium — plausible given what is known; could happen in a normal project
- 3 = High — likely given what is known; would surprise you if it didn't occur
Severity (1-3):
- 1 = Low — causes delay or rework, but project survives
- 2 = Medium — forces significant pivot or scope reduction
- 3 = High — kills the project or invalidates the core premise
Risk score = Likelihood × Severity (1-9) Scores 6-9: Critical — must have a mitigation plan Scores 3-5: Moderate — monitor; mitigation optional Scores 1-2: Low — log and ignore
Step 3 — Mitigation Strategies for Critical Risks
For each Critical risk (score 6-9), define:
- Trigger: What specific event or finding confirms this risk is materializing?
- Mitigation: What action reduces the likelihood or severity before it triggers?
- Contingency: If the risk triggers despite mitigation, what's the response?
- Owner: Who is responsible for monitoring and acting?
- Timeline: When must the mitigation be in place?
A mitigation without a trigger is theater. Name the specific thing you would observe that confirms the risk is real — otherwise "monitoring" this risk means nothing.
Output Artifact
Save to _mh-output/cto/sdlc/risk-register/{date}_{run}_risk-register.md:
# Risk Register
**Version:** 1.0
**Date:** {date}
**Critical risks:** {N} | **Moderate risks:** {N} | **Low risks:** {N}
## Risk Summary
| # | Risk | Category | Likelihood | Severity | Score | Level |
| --- | ----------------- | ------------------------------------------- | ---------- | -------- | ----- | ------------------------- |
| 1 | {brief risk name} | Market / Technical / Execution / Assumption | 1-3 | 1-3 | L×S | Critical / Moderate / Low |
## Critical Risks — Detail
### Risk {N}: {Name}
**Category:** {Market / Technical / Execution / Assumption}
**Description:** {What could go wrong and why it's a risk}
**Score:** Likelihood {N} × Severity {N} = {score}
**Trigger:** {The specific observable signal that this risk is materializing}
**Mitigation:** {Action to take before trigger}
**Contingency:** {Response if risk triggers despite mitigation}
**Owner:** {Who monitors this}
**Timeline:** {When mitigation must be in place}
(Repeat for each critical risk)
## Moderate Risks
| # | Risk | Description | Monitoring approach |
| --- | ---- | ----------- | ------------------- |
## Key Assumptions Still Unverified
{The critical unverified assumptions carried forward — these are the Phase 2 pressure points}
## Phase 2 Risk Considerations
{What do these risks mean for the product definition? Which risks should shape
the MVP scope? Which assumptions must be resolved before the PRD is locked?}
Completion
"Risk register complete. [N] critical risks, [N] moderate risks.
Top critical risks: [list names of score 9 risks, if any].
[If critical risks are present]: These risks should inform MVP scope in Phase 2 — reduce scope to validate the critical unknowns first.
Next: /mh-cto-sdlc-phase1-gate — Phase 1 gate review before product definition begins."
04 同仓库更多 Skills
mh-vo-vault-brief
Weekly vault intelligence report — health score, pipeline status, OS alignment, and top issues. Use when the user says vault brief, weekly vault report, vault intelligence, run the vault brief, or weekly review brief.
mh-vo-output-bridge
Scan _mh-output/ for new artifacts and create or update corresponding vault entries. Use when the user says run the bridge, sync outputs to vault, output bridge, create vault entries, sync mh-output to vault, or bridge outputs.
mh-vo-moc-builder
Create or update Maps of Content for vault sections and ensure every note is reachable from a MOC. Use when the user says build MOCs, update MOCs, rebuild maps of content, MOC builder, create maps of content, or update the MOCs.
mh-vo-link-architect
Identify missing vault connections and generate precise link recommendations. Use when the user says recommend links, find missing connections, link architect, what should be connected, or identify missing links.
mh-vo-base-builder
Generate Obsidian Bases (.base files) for live database views of vault data. Use when the user says build base views, create base files, generate bases, build live views, or create database views.
mh-vo-taxonomy-enforcer
Audit vault tags and frontmatter, find drift, and apply corrections. Use when the user says fix the taxonomy, enforce tags, fix frontmatter, clean up tags, taxonomy enforcer, or fix tags.