storm-recovery-action-plan
Turn a storm or tornado damage snapshot into immediate, near-term, and long-term recovery work with owners.
- License 许可
- MIT
- 最近更新
- 2026-11-02
- Stars
- ★ 1
- Forks
- 0
01 前言 Front Matter
- name
- storm-recovery-action-plan
- description
- Turn a storm or tornado damage snapshot into immediate, near-term, and long-term recovery work with owners.
- argument-hint
- [ "incident" ]
03 SKILL.md 正文
Purpose
Organize post-storm response into phased work with owners, resources, and documentation aligned to NIMS/ICS and the National Disaster Recovery Framework concepts. The plan serves the Incident Commander/EOC and the recovery lead; it supplements, not replaces, the incident action plan.
Required inputs
- Damage snapshot: rapid damage assessment results (housing, public buildings, roads, utilities, trees/debris), initial cost estimates, and unmet needs.
- Declarations: local, state, and federal status; thresholds and deadlines.
- Resources: public works crews, mutual aid, contractors with pre-positioned contracts, debris sites, volunteers.
- Utility restoration status (electric, gas, communications, water, sewer) and critical facility needs.
- Insurance coverage, FEMA/state programs, and prior mitigation plans.
Workflow
- Phase 0 (0 to 72 hours, response): life safety, search and rescue, road clearance for emergency routes, shelter and mass care, utilities safety, hazard isolation, situational awareness, and public alerts. Priority sequence for debris: emergency routes, critical facilities, then residential streets.
- Phase 1 (3 days to 3 weeks, stabilization): damage assessments (local, then joint preliminary damage assessment if requested), debris management plan with monitoring, temporary power/water, temporary facilities, disaster declaration requests, donation and volunteer management, and resident information.
- Phase 2 (weeks to months, restoration): permanent repairs, permitting surge, contractor registration, rental inspection, business support, unemployment and housing assistance referrals, and infrastructure repairs.
- Phase 3 (months to years, recovery and mitigation): rebuilding, hazard mitigation grant projects, plan updates, zoning or building code changes, and long-term community recovery committee.
- Reimbursement protection: track force-account labor, equipment hours, and contracts by site (project worksheets); follow federal procurement rules for FEMA-funded work, noting emergency procurement flexibility is limited and documentation-intensive; separate insurance proceeds; keep photos and time logs; confirm deadlines. Verify current FEMA PA policy.
- Debris: separate categories (vegetative, construction, hazardous, white goods, vehicles), temporary storage sites with environmental precautions, haul-out contracts with pre-event or competitively procured vendors, and monitor hauling with load tickets.
- Permitting and code: emergency permit processes, substantial-damage determinations (50 percent rule in floodplains), temporary housing zoning allowances, and contractor licensing/fraud warnings.
- Equity and vulnerable populations: language access, disabled residents, renters, and unhoused people.
- Assign each action an owner by position, due date, resources, and a status check cadence.
Output structure
| Phase | Action | Owner | Due | Resource/funding | Documentation | Status | Add: priority roads/facilities list, debris plan summary, cost tracker, regulatory deadlines (declaration, requests for public assistance), and communications calendar.
Red flags / escalate
- Deadlines for declarations, FEMA applicant briefings, and request for public assistance.
- Procurement without documented competition or rate reasonableness.
- Hazardous materials, unstable structures, or gas leaks.
- Substantial damage determinations in floodplains.
- Contractor fraud complaints.
- Staff fatigue and safety.
Common mistakes
- Starting recovery without cost documentation.
- Leaving mutual-aid paperwork unsigned.
- Clearing debris from private property without legal authority.
- Not planning for longer-term housing needs.
State-law variance
Declaration authority, private-property debris removal rules, and state recovery programs vary by state.
04 同仓库更多 Skills
town-hall-kit
Prepare a town hall kit with agenda, ground rules, likely questions, follow-up method, and message priorities.
speechwriter
Draft remarks for the mayor, council, manager, or department head in a strong but grounded municipal voice.
social-post-series
Generate a multi-post city social media series with tone control, accessibility, and channel fit.
public-comment-summarizer
Synthesize hearing or meeting comments into themes, misconceptions, unanswered questions, and response options.
press-release-writer
Write a city press release that is accurate, readable, and aligned with legal and operational review needs.
meeting-notice-drafter
Draft a legally sufficient public notice for any city council, board, commission, or committee meeting — covering required content, posting deadlines, and special-meeting or emergency-meeting rules.