procurement-bid-evaluator
Compare bids, proposals, or quotes using documented criteria, threshold awareness, and a defendable recommendation.
- License 许可
- MIT
- 最近更新
- 2026-11-02
- Stars
- ★ 1
- Forks
- 0
01 前言 Front Matter
- name
- procurement-bid-evaluator
- description
- Compare bids, proposals, or quotes using documented criteria, threshold awareness, and a defendable recommendation.
- argument-hint
- [ "solicitation-name" ]
02 资源文件 1
- 参考文档scorecard-template.md105 B
03 SKILL.md 正文
Purpose
Evaluate responses to a solicitation in a way that survives a bid protest, an audit, and a public records request. The method must follow the solicitation as issued: criteria and weights cannot change after opening.
Required inputs
- The solicitation (IFB, RFP, RFQ), addenda, and the procurement method used.
- All responses, bid tabulation, bond/insurance documents, references, and price forms.
- The city's purchasing policy and state procurement statute thresholds (quote, informal bid, formal sealed bid, council approval), and any funding-source rules (federal funds follow 2 CFR 200.317-200.327; state grants may add rules).
- Evaluation committee roster and conflict-of-interest/confidentiality attestations.
Workflow
- Confirm the method fits the dollar value and type: low-bid sealed bid (IFB) for clearly defined goods and construction; RFP with weighted criteria for services where qualifications matter; qualifications-based selection for architects and engineers where state or federal law requires it (price negotiated after ranking). Note that method choice is often set by statute.
- Responsiveness: check each response against mandatory requirements (signed forms, bid security, addenda acknowledged, licensing, insurance, bonds). Minor informalities may be waivable only if the solicitation and law allow; material deviations disqualify.
- Responsibility: financial capacity, past performance, debarment/suspension (SAM.gov for federal funds), local-preference or small/disadvantaged business rules if lawful and stated.
- Score only against published criteria and weights. Each evaluator scores independently, writes a short justification per criterion, and signs. Normalize price scoring with a stated formula (for example, lowest price divided by bidder price times the price points).
- Total cost of ownership: add recurring fees, licensing, maintenance, escalators, training, exit/transition costs, and compare over the term. Check unit prices for front-loading or unbalanced bids.
- Reconcile: tabulate, check arithmetic, document ties and the tie-break rule, and note reference-check results.
- Recommendation: lowest responsive responsible bidder, or highest-ranked proposer, with the contract value, term, funding source and appropriation, and council approval needed.
- File completeness: retain solicitation, proofs of advertisement, all responses, score sheets, minutes, protest-period notice, and award letters per the records retention schedule.
Output structure
| Respondent | Responsive? | Responsible? | Price (base/TCO) | Score by criterion | Total | Rank |
Add: recommendation memo, risk notes per top respondent, protest exposure, funding confirmation, and council action language.
Red flags / escalate
- Evaluators with financial or personal ties to a bidder, or contact with bidders outside the designated process.
- Specifications that match one vendor's product.
- Single response, or price far from the estimate (re-solicit or negotiate per policy).
- Contract splitting or add-on change orders that bypass the threshold.
- Use of AI tools in evaluation: disclose tool name/version, the criteria and weights supplied, and confirm the tool vendor has no commercial relationship with any bidder. AI scores are drafts; a named human officer must review and sign the final scoring record.
- Protest filed or bid mistake claimed: route to the city attorney.
Common mistakes
- Changing criteria after opening.
- Scoring unstated preferences.
- Awarding on price when the solicitation promised best value.
- Failing to document why a lower-priced bid was rejected.
- Ignoring tail costs.
State-law variance
Bid thresholds, local-preference limits, design-build, cooperative purchasing, and protest procedures vary by state and charter. Verify.
04 同仓库更多 Skills
town-hall-kit
Prepare a town hall kit with agenda, ground rules, likely questions, follow-up method, and message priorities.
speechwriter
Draft remarks for the mayor, council, manager, or department head in a strong but grounded municipal voice.
social-post-series
Generate a multi-post city social media series with tone control, accessibility, and channel fit.
public-comment-summarizer
Synthesize hearing or meeting comments into themes, misconceptions, unanswered questions, and response options.
press-release-writer
Write a city press release that is accurate, readable, and aligned with legal and operational review needs.
meeting-notice-drafter
Draft a legally sufficient public notice for any city council, board, commission, or committee meeting — covering required content, posting deadlines, and special-meeting or emergency-meeting rules.