effort-estimation
Estimate engineering effort with agile techniques — story points, t-shirt sizing, three-point estimation, capacity planning.
- License 许可
- MIT
- 最近更新
- 2026-11-12
- Stars
- ★ 1
- Forks
- 1
01 前言 Front Matter
- name
- effort-estimation
- description
- Estimate engineering effort with agile techniques — story points, t-shirt sizing, three-point estimation, capacity planning.
- when_to_use
- Triggers: estimate this, how long will this take, story points, t-shirt sizing, effort estimation, capacity planning, sprint planning, budget estimate, forecast, velocity, when will this be done.
02 资源文件 2
- 参考文档evals/evals.json3.5 KB
- 参考文档references/estimation-methods.md5.2 KB
03 SKILL.md 正文
Effort Estimation
Produce honest, useful estimates without false precision. Estimates are forecasts, not commitments — always ranges, always improving as you learn more.
Workflow
Step 1: Ensure Tasks Are Defined
You can't estimate undefined work. Tasks must be broken down (use feature-planning
if not), have acceptance criteria, and have at least a sketched technical approach.
"I can't estimate this until we do a spike" is a valid and responsible answer.
Step 2: Choose the Method
T-shirt sizing for roadmap and early-stage sizing; story points (Fibonacci) for sprint planning and velocity tracking; three-point estimation for budget requests and high-uncertainty, high-stakes work; time-based only for well-understood tasks. See references/estimation-methods.md for detailed guidance on each method.
Step 3: Apply It
Estimate per task, not the project as a single unit; relative to known work rather than in absolute terms; as a team where possible (the familiarity gap between estimators reveals hidden complexity); with uncertainty explicit. Re-estimate when spikes complete or requirements clarify.
Step 4: Translate for Stakeholders
Convert to time or cost via team velocity or loaded cost, add a 20-30% buffer for unknowns, and communicate a range in stakeholder language — weeks and dollars, not story points. A single number becomes a commitment; a range communicates confidence.
Say when the number gets revisited. A range nobody revisits hardens into the commitment you avoided giving — so hand over the estimate with its re-forecast attached: the next point where real data replaces assumption (a phase boundary, the end of a spike, the first sprints of actuals), and what would move the number. That sentence is what keeps an early-discovery estimate honest; without it, "wide range" is just a number the stakeholder rounds down.
Step 5: Track and Calibrate
Compare estimated with actual — per sprint on delivery work, at each phase boundary on a project-sized estimate — look for systematic bias, and recalibrate on the last 3-5 data points, not the all-time average.
Principles Applied
- KISS: Use the simplest estimation method appropriate. T-shirt sizing is fine for most roadmap decisions.
- Honesty over optimism: A realistic estimate that disappoints a stakeholder is better than an optimistic estimate that misses a deadline.
- YAGNI: Don't estimate items far in the future with precision. Estimate near-term work in detail, far-term work in ranges.
04 同仓库更多 Skills
writing-skills
Use when authoring, editing, or reviewing a skill in this library — a new SKILL.md, one that under-triggers, or hardening an existing one. Covers description and listing-budget rules, frontmatter, progressive disclosure, the 3-eval rule, and pressure-testing against rationalizations.
working-agreement
Define and validate how a multi-session project is run — where plans, status and decisions live, session routines, new work, milestone close. README/CONTRIBUTING → project-documentation.
verification-before-completion
Evidence gate before any claim that work is done, fixed, passing, or deployed. Route here when a message declares the work finished or asks to commit, push, merge, ship, or close it out, including a brief sign-off, and before git-workflow or release-management act on it. Writing the commit message or PR text itself → git-workflow.
ui-ux-design
Design user experiences from an engineer's perspective — user flows, wireframes, interaction patterns, responsive strategy, navigation, loading/error/empty states. Triggers: design the UI, user flow, wireframe, how should this screen look, loading state, error state, empty state, responsive design, navigation, page layout, form design, mockup.
threat-modeling
Design-time security analysis of a system or feature before it's built — trust boundaries, attack surface, STRIDE per element, abuse cases, prioritized mitigations that become security requirements. Triggers: threat model, STRIDE, trust boundary, attack surface, what could go wrong security-wise, security design review, abuse case, secure this design, security requirements. Reviewing EXISTING code/config for vulnerabilities → security-audit; use this skill while the design is still on the whiteboard.
test-suite-design
Design comprehensive test suites for existing code — strategy across unit/integration/e2e, fixtures, factories, helpers. Triggers: add tests, write tests for, increase coverage, test this module, testing strategy, test plan, what tests do I need, test infrastructure, test helpers, this has no tests. Not for TDD — use tdd-workflow.