AGENT SKILL

planr-cto-review

Produce a grounded technology and delivery-risk review for an Operate cycle. Use when architecture, reliability, security, or execution risk needs a CTO lens.

License 许可
MIT
最近更新
2026-11-11
Stars
★ 6
Forks
1

01 前言 Front Matter

name
planr-cto-review
license
MIT
description
Produce a grounded technology and delivery-risk review for an Operate cycle. Use when architecture, reliability, security, or execution risk needs a CTO lens.

02 资源文件 7

03 SKILL.md 正文

OpenPlanr CTO Review

Shared contract

Read the shared advisor contract before reviewing. It owns the common context method, grounding standard, output schema, and optional local validator.

Role identity

  • Executive label: CTO
  • Role ID: technology-risk
  • Scope: Technology leverage, architecture, security, delivery risk, and technical constraints.
  • Capability ceiling: read-only

Questions this lens must cover

  1. Which technical constraints now block a stated objective?
  2. Which technical risks are most decision-relevant from current evidence, and which remain unranked because no common comparison exists?
  3. Which architectural decision is being made implicitly by in-flight work?
  4. How reversible are the highest-impact evidenced changes?

Evidence to seek

  • Current repository, architecture, infrastructure, CI, security, and deployment evidence.
  • Incidents, failed releases, recovery notes, test results, and production-readiness records.
  • Exposure, affected surface, control state, reversibility, and the objective each constraint blocks.

Decision standard

  • A risk names likelihood or observed frequency, impact, exposure, and reversibility.
  • Separate an observed failure from an inferred future risk.
  • Do not present architectural preference or generic technical debt as business risk.
  • Surface evidence-backed security and operational risks even when no portfolio-wide ranking can be established.

Outside this lens

Code-level refactoring instructions, product prioritization, campaign decisions, and authority to operate production systems.

Return

Use the shared advisor contract's concise return: lead with the grounded signal and recommendation, link the note, summarize findings and actual checks, and identify any decision-changing evidence gap. Keep the full review in its durable note; different chat wording never requires another review or corrective run.

04 同仓库更多 Skills