implement-plan
Execute an approved implementation plan from the configured plans directory. Use when the user wants to implement a plan phase by phase with verification.
- License 许可
- MIT
- 最近更新
- 2026-11-15
- Stars
- ★ 34
- Forks
- 3
01 前言 Front Matter
- name
- implement-plan
- description
- Execute an approved implementation plan from the configured plans directory. Use when the user wants to implement a plan phase by phase with verification.
- allowed-tools
- [ "Bash(accelerator config *)", "Bash(accelerator corpus frontmatter validate *)" ]
- argument-hint
- [path to plan file]
02 资源文件 4
- 参考文档LEARNINGS.md7.5 KB
- 参考文档references/daily-loop.md2.4 KB
- 参考文档references/primitives.md3.7 KB
- 参考文档references/troubleshooting.md3.6 KB
03 SKILL.md 正文
Implement Plan
!accelerator config context --skill implement-plan --fail-safe
!accelerator config agents --fail-safe
If no "Agent Names" section appears above, use these defaults: accelerator:reviewer, accelerator:codebase-locator, accelerator:codebase-analyser, accelerator:codebase-pattern-finder, accelerator:documents-locator, accelerator:documents-analyser, accelerator:web-search-researcher.
Plans directory: !accelerator config path plans --fail-safe
You are tasked with implementing an approved technical plan from the configured plans directory (shown above). These plans contain phases with specific changes and success criteria.
Getting Started
When given a plan path:
- Read the plan completely and check for any existing checkmarks (- [x])
- Read the original work item and all files mentioned in the plan
- Read files fully - never use limit/offset parameters, you need complete context
- Think deeply about how the pieces fit together
- Create a todo list to track your progress
- Start implementing if you understand what needs to be done
If no plan path provided, ask for one.
Implementation Philosophy
Plans are carefully designed, but reality can be messy. Your job is to:
- Follow the plan's intent while adapting to what you find
- Implement each phase fully before moving to the next
- Verify your work makes sense in the broader codebase context
- Update checkboxes in the plan as you complete sections
When things don't match the plan exactly, think about why and communicate clearly. The plan is your guide, but your judgment matters too.
If you encounter a mismatch:
- STOP and think deeply about why the plan can't be followed
- Present the issue clearly:
Issue in Phase [N]: Expected: [what the plan says] Found: [actual situation] Why this matters: [explanation] How should I proceed?
Verification Approach
After implementing a phase:
- Pause and let me review all the changes you have made
- Run the success criteria checks (usually
./gocovers everything) - Fix any issues before proceeding
- Update your progress in both the plan and your todos
- Check off completed items in the plan file itself using Edit
Don't let verification interrupt your flow - batch it at natural stopping points.
Validate the frontmatter: after writing, run corpus frontmatter validate over the plan file whose checkboxes you just updated:
accelerator corpus frontmatter validate --file <path>
If it exits non-zero, the plan violates the canonical frontmatter standard; report the emitted violation and fix the frontmatter before completing.
If You Get Stuck
When something isn't working as expected:
- First, make sure you've read and understood all the relevant code
- Consider if the codebase has evolved since the plan was written
- Present the mismatch clearly and ask for guidance
Use sub-tasks sparingly - mainly for targeted debugging or exploring unfamiliar territory.
Resuming Work
If the plan has existing checkmarks:
- Trust that completed work is done
- Pick up from the first unchecked item
- Verify previous work only if something seems off
Remember: You're implementing a solution, not just checking boxes. Keep the end goal in mind and maintain forward momentum.
!accelerator config instructions implement-plan --fail-safe
04 同仓库更多 Skills
explore-pr
Build an interactive, design-first and picture-first exploration page for a pull request — its architecture, abstractions and design decisions drawn as diagrams, a guided tour in reading order with code as the evidence, an attention map of where the risk sits, a ledger of its riskiest operations, prior review findings re-checked against the code, and simulations specific to the PR — with the reviewer's verdicts and notes saved. Use when the user wants to explore, understand or review a large pull request or its design, asks for a review page, walkthrough or visual explanation of a PR, or is struggling to review a big change.
update-work-item
Update fields (status, priority, tags, parent, etc.) of an existing work item. Use to transition status, change priority, manage tags, or edit any frontmatter field. No transition enforcement — arbitrary changes are allowed.
sync-work-items
Reconcile local work items in meta/work/ with the active remote tracker named by work.integration. Use when the user wants to sync, push, or pull work items to or from Jira or Linear, preview what a sync would change, or reconcile divergent local and remote state.
sync-work-items-recovery
Recovery procedures for work sync failures that need a person — terminal rows, refused pending pushes and refused orders. Read by sync-work-items — not invoked directly.
stress-test-work-item
Interactively stress-test a work item by grilling the user on scope, assumptions, acceptance criteria, edge cases, and dependencies to surface issues, gaps, and flawed assumptions before implementation is planned.
review-work-item
Review a work item through multiple quality lenses and collaboratively iterate based on findings. Use when the user wants to evaluate a work item before implementation or escalation.