AGENT SKILL
design
fixture
- License 许可
- MIT
- 所属仓库
- Nharu/cc-cmds
- 最近更新
- 2026-11-14
- Stars
- ★ 3
- Forks
- 1
01 前言 Front Matter
- name
- design
- description
- fixture
03 SKILL.md 正文
Step 2: Team Composition Proposal (Korean)
- How many roles: bounded by the shared team size budget.
Small-work gate (evaluated once on entering this step)
Risk indicators outrank the size row. A contract or schema change composes for that risk no matter how small the surface is.
When it fires: no risk indicator fired and the work is a single surface in a single target repository.
The floor sentence is deleted here — the heading is present, so the lever fires and the missing pin must make the lint red.