AGENT SKILL

design

fixture

适用职业设计师
使用场景视觉设计
License 许可
MIT
所属仓库
Nharu/cc-cmds
最近更新
2026-11-14
Stars
★ 3
Forks
1

01 前言 Front Matter

name
design
description
fixture

03 SKILL.md 正文

Step 2: Team Composition Proposal (Korean)

  • How many roles: bounded by the shared team size budget.

Small-work gate (evaluated once on entering this step)

Risk indicators outrank the size row. A contract or schema change composes for that risk no matter how small the surface is.

When it fires: no risk indicator fired and the work is a single surface in a single target repository.

The floor sentence is deleted here — the heading is present, so the lever fires and the missing pin must make the lint red.

04 同仓库更多 Skills