jtbd-timeline
Moesta/Switch JTBD timeline — map first thought→passive→active→deciding→consuming→satisfaction with push/pull/anxiety/habit forces
- License 许可
- MIT
- 最近更新
- 2026-11-10
- Stars
- ★ 1
- Forks
- 0
01 前言 Front Matter
- name
- jtbd-timeline
- type
- research
- parent
- journey-map
- version
- v0.1
- invocation
- sub-skill
- description
- Moesta/Switch JTBD timeline — map first thought→passive→active→deciding→consuming→satisfaction with push/pull/anxiety/habit forces
02 资源文件 3
- 脚本index.ts830 B
- 脚本pass-check.ts876 B
- 脚本permissions.ts177 B
03 SKILL.md 正文
Pack Availability Guard
Before telling the user to run a skill from another project-local pack, check .agents/project.json.enabled_packs. If the target pack is not enabled, recommend /pack install <pack> instead of the target skill. Global skills are always valid. Skills from this same pack are valid because the current skill is already running from that pack.
JTBD Timeline — Moesta/Switch Analysis
Report-First Approval Gate
Default to report-only: present findings, evidence coverage, assumptions, recommended artifact path, and proposed file changes in a pre-approval alignment page plus a concise conversation summary for user approval before creating or updating canonical research, spec, or task files.
Do not write or overwrite synthesized deliverables until the user explicitly approves, unless the user invoked an explicit write/update/fix mode or clearly asked to write files upfront. Raw evidence capture may be persisted before analysis when reproducibility requires it; report those raw paths separately and still gate synthesized research/report writes.
When stopping for approval, build and attempt to open the alignment preview page first, then ask the user to review it and approve, question, or request adjustments. Do not include Recommended next skill, Recommended next command, or downstream routing language. The approval request itself is the next action. Only emit next-skill routing after the approved artifact has been written or updated.
Staged Research Workflow
Use this staged workflow for synthesized research or report outputs that would create or update canonical research, spec, or task files.
- Stage 1 - Research and clarify. Perform the research, run required source/code checks, and ask any needed clarification questions. Write only a non-canonical working packet: flat mode uses
research/_working/preliminary-jtbd-timeline-research.md; product-path mode usesresearch/{slug}/_working/preliminary-jtbd-timeline-research.md. Do not create or update canonical research, spec, or task files in Stage 1. - Stage 2 - Review alignment. Consume the working packet and build the
reviewHTML alignment page. The page must render the full preliminary packet, evidence matrix, assumptions/confidence register, source coverage gaps, proposed canonical file changes, and approval gates. Stop for either feedback-only YAML or final compiled YAML. - Stage 3 - Finalize approved artifacts. Consume final compiled YAML only when it has no unresolved negative feedback. Apply approved edits first, archive the working packet, write the approved canonical artifacts, and convert the alignment page to
confirmed.
Evidence And Feedback Handling
Treat user feedback as input to evaluate, not as automatic ground truth.
- For factual, evidentiary, technical, or source-backed claims: verify against available evidence. Push back clearly and cite the evidence when the user appears to misunderstand.
- For taste, prioritization, or subjective judgment calls: weigh user feedback heavily and adapt unless it conflicts with verified evidence.
- When uncertain, say what is known, what is inferred, and what would change the conclusion.
Prerequisites
- Hard:
research/icp.md(orresearch/{slug}/icp.md) must exist. If not, tell the user to run/customer-discoveryfirst and stop. - Soft:
research/competitive-analysis.md,research/customer-feedback.md, specs, and codebase context when available.
Process
0. Product-Path Scope Resolution
Resolve research scope by product path before using code or app structure as a hint:
- If
$ARGUMENTSnames a non-archivedresearch/{slug}/directory or a product-path ID whosescope_pathpoints there, use that path. Treat{slug}as the product/app name, not the ICP, audience, or segment label. - If
$ARGUMENTSnames onlyresearch/_archive/{slug}/or a manifest entry withstatus: archivedor legacystatus: abandoned, stop and warn that the path is archived; do not write or update scoped outputs there. - Read
research/.progress.yamlwhen present. Normalize legacyactive_pathtoactive_pathson read and write backactive_pathson manifest updates. Treat legacyabandonedasarchived; excludearchived,abandoned,deferred,revisit_candidate,promoted, and anyscope_pathunderresearch/_archive/from active target selection. - If active product paths exist in the manifest, use those paths. If multiple active paths exist, ask which one to target unless this skill explicitly supports cross-path output.
- If no active manifest target exists, list non-archived product directories under
research/, excludingresearch/_archive/and dot directories. Auto-select only when exactly one exists; ask when multiple exist. - If no product directories exist, use flat
research/single-product mode. - Detect monorepo/app/package structure only as a secondary hint.
When product path {slug} is active, read and write research under research/{slug}/, specs under specs/{slug}/.
1. Load Context
- Read
research/icp.md— ICP segments, pain points, trigger events - Read
research/competitive-analysis.mdif it exists — what alternatives customers switch from/to - Read
research/customer-feedback.mdif it exists — switching stories, frustrations, trigger language - Read CLAUDE.md, README for product context
2. Map the Switching Timeline
Reconstruct the customer's decision timeline using Moesta's six stages:
First Thought: The moment the customer first realizes something isn't working. What triggered awareness? What was the catalyzing event?
Passive Looking: The customer is aware but not actively searching. They notice alternatives, read about options, but haven't committed to change. What keeps them in passive mode? What would accelerate them?
Active Looking: The customer is now deliberately evaluating alternatives. What criteria are they using? What channels are they searching? Who are they asking?
Deciding: The customer has narrowed options and is making a choice. What is the final trigger? What reassurance do they need? What objections remain?
Consuming: The customer has switched and is using the new solution. What does the first experience look like? When does buyer's remorse or confirmation set in?
Satisfaction: The customer evaluates whether the switch was worth it. Are they better off? Would they recommend? Would they switch again?
3. Map the Four Forces
For each timeline stage, identify the four forces that drive or resist change:
Push of the current situation (drives change):
- What frustrations, limitations, or failures push the customer away from their current solution?
- What is getting worse over time?
- What events amplify the push?
Pull of the new solution (drives change):
- What about the new solution attracts the customer?
- What outcomes or capabilities are they drawn to?
- What promises or proof creates pull?
Anxiety of the new solution (resists change):
- What worries the customer about switching?
- What could go wrong?
- What uncertainty exists about the new solution?
- What learning curve or migration cost is feared?
Habit of the current situation (resists change):
- What keeps the customer with their current solution despite frustrations?
- What workflows, integrations, or muscle memory create inertia?
- What switching costs (real or perceived) exist?
4. Identify Force Imbalances
Analyze where forces are misaligned:
- Where is push strong but pull weak? (customer wants to leave but has nowhere compelling to go)
- Where is pull strong but anxiety blocks? (customer wants the new solution but fears the switch)
- Where is everything aligned but habit wins? (customer should switch but inertia is too strong)
- What is the minimum force combination needed to trigger switching?
5. Identify the Hiring Criteria
What the customer is actually "hiring" the product to do:
- Functional job: what task or outcome they need accomplished
- Social job: how they want to be perceived by others
- Emotional job: how they want to feel
6. Validate with User
Present the timeline, forces analysis, and hiring criteria. Ask for corrections, missing stages, and product-specific context.
Output
research/journey-map-jtbd-timeline.md (or research/{slug}/journey-map-jtbd-timeline.md)
# JTBD Switching Timeline
> Based on: research/icp.md[, other evidence]
> Date: [current date]
> Methodology: Moesta/Switch JTBD Timeline
## Switching Timeline
| Stage | Customer State | Duration | Key Evidence |
|-------|---------------|----------|-------------|
| First Thought | [catalyzing event] | [timeframe] | [source] |
| Passive Looking | [awareness state] | [timeframe] | [source] |
| Active Looking | [evaluation criteria] | [timeframe] | [source] |
| Deciding | [decision trigger] | [timeframe] | [source] |
| Consuming | [first experience] | [timeframe] | [source] |
| Satisfaction | [outcome evaluation] | [timeframe] | [source] |
## Four Forces Analysis
### Push of Current Situation
| Force | Intensity | Stage Most Active | Evidence |
|-------|-----------|-------------------|----------|
| [frustration/failure] | High/Medium/Low | [stage] | [source] |
### Pull of New Solution
| Force | Intensity | Stage Most Active | Evidence |
|-------|-----------|-------------------|----------|
| [attraction/outcome] | High/Medium/Low | [stage] | [source] |
### Anxiety of New Solution
| Force | Intensity | Stage Most Active | Evidence |
|-------|-----------|-------------------|----------|
| [worry/uncertainty] | High/Medium/Low | [stage] | [source] |
### Habit of Current Situation
| Force | Intensity | Stage Most Active | Evidence |
|-------|-----------|-------------------|----------|
| [inertia/switching cost] | High/Medium/Low | [stage] | [source] |
## Force Imbalances
| Imbalance | Stage | Implication | Intervention |
|-----------|-------|-------------|-------------|
| [type] | [stage] | [what this means] | [what could shift it] |
## Hiring Criteria
### Functional Job
[What task or outcome they need]
### Social Job
[How they want to be perceived]
### Emotional Job
[How they want to feel]
## Evidence Matrix
| Claim | Evidence Source | Evidence Type | Confidence |
|-------|---------------|---------------|------------|
| [claim] | [source] | Observed/Inferred/Hypothesized | High/Medium/Low |
Constraints
- Ground every timeline stage and force in ICP, research, specs, feedback, or codebase evidence.
- Do not prescribe UI or architecture — describe the switching journey, not the solution.
- Present findings before writing.
- Do not overwrite existing output without asking the user first.
- This is a sub-skill — do not emit next-step routing.
Alignment Page
When this skill produces durable deliverables (research, specs, plans, reports, prototypes, or any document output), build a full-depth HTML alignment page following ALIGNMENT-PAGE.md in this skill's directory. Output: alignment/jtbd-timeline-{topic}.html.
Default Shipping Contract
Follow the shared shipping contract convention in CLAUDE.md.
04 同仓库更多 Skills
source-checkout-allowed
Valid source-checkout-only fixture.
deck-install-valid
Valid deck install fixture.
codex-pack-guard-valid
Valid Codex Pack Availability Guard fixture.
codex-missing-skill-valid
Valid Codex missing skill fallback fixture.
codex-base-skill-fallback-valid
Valid Codex base skill fallback fixture.
claude-pack-guard-valid
Valid Claude Pack Availability Guard fixture.