AGENT SKILL

roadmap-kanban

PoketoWork kanban variant of roadmap — sync roadmap phases and current steps to cards

适用职业产品经理
License 许可
MIT
最近更新
2026-11-10
Stars
★ 1
Forks
0

01 前言 Front Matter

name
roadmap-kanban
type
planning
version
v0.0
description
PoketoWork kanban variant of roadmap — sync roadmap phases and current steps to cards
allowed-tools
Bash(poketo *)
argument-hint
[--existing] [path-to-spec]

03 SKILL.md 正文

Roadmap Kanban

Use this skill only in projects that have opted into a PoketoWork kanban pack.

Process

  1. Follow the base /roadmap workflow exactly, passing through $ARGUMENTS.
  2. Resolve and validate the project board using tasks/.kanban-board, poketo kanban boards, and the standard lists: Backlog, Todo, In Progress, Done, Punt.
  3. Fetch the board and show a brief overview before roadmap work.
  4. After the base roadmap writes or updates tasks/roadmap.md and tasks/todo.md, sync cards:
    • For each unchecked current step in tasks/todo.md, search for a matching card. Move it from Backlog to Todo, leave it alone if already Todo or later, or create it in Todo with phase context.
    • For each future roadmap phase, search for a matching phase card. Create a Backlog summary card when missing.
    • Do not create ordinary Todo cards from tasks/record-todo.md or tasks/recurring-todo.md. Report advisory counts separately unless an item has been promoted into tasks/todo.md.
  5. Report cards created, moved, skipped, and any failures.

Only move cards from Backlog to Todo. Never move cards backward. If kanban fails, warn and keep the roadmap output.

Next-Step Routing

In the final response, include either Recommended next skill: <command> or the two-line pair **Next work:** <specific task or "none"> and **Recommended next command:** <one command or route>. Route to the matching kanban workflow when board state can advance; otherwise route to the documented non-kanban fallback or say No follow-up skill recommended with the reason.

Alignment Page

When this skill produces durable deliverables (research, specs, plans, reports, prototypes, or any document output), build a full-depth HTML alignment page at alignment/roadmap-kanban-{topic}.html. Use a normalized topic slug derived from the app, feature, research subject, report subject, or output filename.

Full content requirement. The alignment page must contain the complete content of every proposed markdown deliverable -- every section, every finding, every detail, every list item. It is a thorough interactive review document, not a summary. Render the full deliverable content in clean, readable HTML with appropriate hierarchy, styling, and navigation. If the skill writes multiple scoped deliverables in one run, build one alignment page that contains all deliverables with anchor-linked navigation. Durable tracker artifacts, such as research/assumption-tracker.md, remain canonical markdown outputs but must also be fully rendered into the alignment page before approval.

Dark-mode styling. Use a dark color scheme by default. Base CSS variables: --bg: #0d1117; --surface: #161b22; --border: #30363d; --text: #c9d1d9; --text-muted: #8b949e; --accent: #58a6ff; --green: #3fb950; --red: #f85149; --orange: #d29922; --purple: #bc8cff;. Apply background: var(--bg); color: var(--text); on body. Use --surface for cards, nav, and table headers. Use --border for all borders. Use --purple for question blocks and gate headings. Use --accent for links and section headings. Keep headings color: #fff or var(--accent) for hierarchy. Question block backgrounds should use #1c2333.

Alignment gates. Treat gates as explicit review sections inside the HTML page. A gate blocks finalization until its required inline questions are answered and compiled into YAML. Include every gate that applies to the skill output, and include these gate types whenever relevant: evidence coverage, assumptions/confidence, scope/non-goals, candidate/verdict decisions, artifact destination, proposed file changes, coverage checkpoint, and post-approval route.

Report-only research gates. For report-only or pre-approval research skills, the alignment page must explicitly contain evidence coverage, assumptions/confidence, recommended path, proposed file changes, and approval gates before any canonical research, spec, or task file is created or updated.

Required inline questions. Each gate must contain at least one required inline question placed directly under the content it governs, inside a visually distinct question block. Each question must use radio-button inputs and include two standing options after the skill-generated choices: "Other / None of the above" backed by a multi-line text box for free-form input, and "Need clarification" backed by an optional notes box where the user can explain what is unclear. When any radio option other than "Other" or "Need clarification" is selected, show an optional "Additional notes" text box beneath it so the user can qualify their choice. Generate questions based on what genuinely needs user input -- do not add filler questions. Do not create a separate bottom "Decisions & Clarifications" section.

Gate YAML contract. At the bottom of the page, include a "Compile Answers" button that aggregates answers from all inline gate questions throughout the page, including free-text notes. The button remains disabled until every required question has a selection, shows a count of remaining unanswered questions, and scrolls to the first unanswered question if clicked early. When every question is answered, generate a structured YAML block with one item per gate answer using this stable shape: section, gate_type, status (answered, other, or needs-clarification), answer, optional notes, and optional target_artifact or target_path when the gate controls file output. After successful compilation, automatically attempt to copy the YAML to the clipboard with the Clipboard API, display copy status, and display the YAML in a read-only textarea with an explicit "Copy YAML" button. The copy button must retry clipboard copy when supported and fall back to selecting the textarea contents when clipboard access is unavailable or blocked.

Pre-approval stop. Before user approval, the next action is review of the HTML alignment page, not downstream routing. Ask the user to review the page and provide the compiled YAML answers. Do not include Recommended next skill, Recommended next command, or downstream routing language until after compiled YAML has been provided and the approved artifacts have been written or updated.

Diff highlighting on updates. When the agent updates an existing alignment page after receiving compiled answers, highlight what changed since the previous version. The agent chooses inline annotation or side-by-side layout per situation.

Archiving. Before replacing an existing alignment page, archive it to docs/history/archive/YYYY-MM-DD/HHMMSS/alignment/roadmap-kanban-{topic}.html.

Browser open. Attempt to open the resulting HTML page in the browser and report whether the open succeeded or was blocked. A blocked browser-open attempt does not make the skill fail when the files were written correctly.

04 同仓库更多 Skills