project-next
Advance tasks and phases in the lifecycle. Run when the user types /project next, finishes a task, or needs to transition phases.
- License 许可
- MIT
- 最近更新
- 2026-04-20
- Stars
- ★ 6
- Forks
- 1
01 前言 Front Matter
- name
- project-next
- description
- Advance tasks and phases in the lifecycle. Run when the user types /project next, finishes a task, or needs to transition phases.
02 资源文件 3
- 参考文档Workflows/Create.md2.4 KB
- 参考文档Workflows/Query.md3.9 KB
- 参考文档Workflows/Troubleshoot.md4.3 KB
03 SKILL.md 正文
Project Next — Task & Phase Advancement
Move tasks through the state machine and handle phase transitions. References the canonical state machine in /project router.
Step 1: Read State
Read tasks.json v2. Identify:
- Current active phase
- Tasks in current phase by status
- Whether all tasks are closed
Step 2: Determine Action
If no task is in-progress
Show open tasks in the current phase and ask:
Which task do you want to work on?
- APP-003 — API route handlers
- APP-004 — Error handling middleware
- APP-005 — Input validation
Set chosen task to status: "in-progress". Update meta.last_modified.
If a task is in-progress
Ask what happened:
APP-003: API route handlers Status: in-progress
What's the update?
- Done — I'll collect verification and close it
- Defer — park it with a trigger condition
- Still working — just checking in
Closing a task (Done)
Collect the verification fields defined in the /project router's canonical state machine:
tests_passed,test_command,test_output_summary,verified_at— required alwaysspec_coverage— required ONLY whentest_specis non-null
If the user can't provide test evidence, explain:
Verification is required to close a task. The board checks these fields at Phase Exit (T5). What test command validates this work?
Set status: "closed" and populate verification object.
Deferring a task
Require a trigger condition:
What condition should promote this back to active? (e.g., "when user count exceeds 100", "when auth provider is chosen")
Set status: "deferred", populate trigger field.
Step 3: Phase Transition Check
After closing a task, check: are all tasks in the active phase closed (or deferred)?
If yes:
All tasks in Phase {N} are complete. Ready for Phase Exit review?
This triggers Touchpoint 5 (Phase Exit) — Standard mode, full board review. The board will review the git diff from phase start to now, plus all verification fields.
Run
/project reviewto proceed.
If no: show remaining tasks and suggest picking the next one.
Step 4: Phase Advancement (after board sign-off)
After the board signs off at T5:
- Set phase
status: "complete",completed: "{today}" - Create annotated git tag:
- Convention:
lifecycle/phase-{N}-complete - Check for existing tag: if exists, append
-v2,-v3, etc. (incrementing loop) - Annotation: phase goal + completion date
- Convention:
- Activate next phase:
status: "active",started: "{today}" - Update
meta.current_phase - Regenerate
tasks.mdfor new phase
Phase {N} complete! Tagged
lifecycle/phase-{N}-complete. Phase {N+1}: {name} is now active.Run
/project reviewfor Phase Plan review (T2), or/project nextto start picking tasks.
Step 5: Phase Rejection Recovery
If the board rejects at T5:
- Phase stays
active— no git tag - Read FIX NOW findings from the review
- Create new tasks in the same phase for each FIX NOW finding:
source: "board-review-T5"status: "open"type: "fix"
- Already-closed tasks stay closed unless specifically named in a finding
- Show the user what was added
Board rejected Phase Exit. {N} new tasks added from FIX NOW findings:
- APP-010: {finding title}
- APP-011: {finding title}
Work through these, then
/project nextwill re-trigger T5 when all tasks are closed.
04 同仓库更多 Skills
teardown
Remove a FrontierBoard installation. Run when the user types /teardown or asks to uninstall, remove, or clean up the board.
smoke-test
Validate a board installation works end-to-end. Run when the user types /smoke-test or asks to test, validate, or verify the board setup.
setup
Set up the Board of Governance. Run when the user types /setup or asks to set up, install, or configure the board for the first time.
run
Run the board agents and synthesise their reports. Run when the user types /run, asks to run the board, or after /brief when the user confirms they're ready to go.
review-release
Review a GitHub repo or release using the board. Use when the user types /review-release, asks to "review a release", "check if this is safe to install", "look at the latest version of [repo]", wants to "try installing it and see what breaks", or any variant of reviewing an external GitHub project before contributing to it or installing it.
project-tests
Generate test specs (Skeptic writes) and verify test code (Skeptic reviews). Two modes — /project tests for specs, /project tests --verify for code review.