rapid-prototype
Builds a time-boxed MVP (4 hours, 1 day or 3 days) for a proof of concept or demo, skipping the RFC, security review and full QA. Use to validate an idea fast.
- License 许可
- MIT
- 所属仓库
- vibbs/company-os
- 最近更新
- 2026-10-21
- Stars
- ★ 6
- Forks
- 2
01 前言 Front Matter
- name
- rapid-prototype
- runtimes
- { "claude": { "argument-hint": "<what you want to prototype>", "user-invocable": true } }
- description
- Builds a time-boxed MVP (4 hours, 1 day or 3 days) for a proof of concept or demo, skipping the RFC, security review and full QA. Use to validate an idea fast.
03 SKILL.md 正文
Rapid Prototype
Reference
- ID: S-ORG-11
- Category: Orchestration
- Inputs: objective description, company.config.yaml
- Outputs: mini-PRD, working prototype, demo script
- Used by: User (directly via /rapid-prototype), Orchestrator Agent
- Tool scripts: ./tools/artifact/validate.sh, ./tools/db/seed.sh
Purpose
Build the smallest thing that proves a hypothesis -- fast. This is an alternative to /ship for time-boxed proof-of-concept work. It deliberately skips RFC, security review, full QA, and growth assets to maximize speed.
When to Use
- Proof of concept for a new idea
- Investor demo preparation
- Hackathon project
- Validating a UX approach before committing to full build
- "Can we even build this?" technical spikes
When NOT to Use
- Production features (use
/ship) - Anything touching user data in production
- Features that need security review
- Anything that will be deployed to real users without further hardening
Procedure
Step 1: Load Configuration
Read company.config.yaml and extract:
tech_stack.*-- language, framework, runtime, databasecompany.stage-- affects whether prototype approach is appropriateconventions.*-- commit style, branching
Step 2: Select Time-Box
Ask the user which time-box applies:
| Time-Box | Scope | Data | Tradeoffs |
|---|---|---|---|
| 4-hour sprint | 1-2 features, single screen | Hardcoded data OK | Fastest feedback, throwaway quality, proves a single interaction |
| 1-day build | 3-4 features, 2-3 screens | Real data shape but mocked backends OK | Enough polish to show stakeholders, still disposable |
| 3-day build | 5-6 features, full flow | Real backend with shortcuts (no auth, no edge cases) | Demo-ready, can evolve into production with significant rework |
Present tradeoffs for each and let user choose.
Step 3: Define What to Prove
Ask: "What hypothesis does this prototype validate?"
Force a single sentence hypothesis. If user gives multiple, force them to pick ONE. The prototype exists to validate one thing -- not to be a mini product.
Step 4: Scope Ruthlessly
Maximum 3 acceptance criteria. If user proposes more, cut. Use this template:
## Mini-PRD: {Prototype Name}
**Hypothesis**: {single sentence}
**Time-box**: {4h | 1d | 3d}
**Date**: {today}
### Acceptance Criteria (max 3)
1. {AC-1}
2. {AC-2}
3. {AC-3}
### Explicitly Out of Scope
- Authentication / authorization
- Error handling beyond basic try/catch
- Responsive design (pick ONE viewport)
- Automated tests
- Security review
- Performance optimization
- Documentation
### Demo Script
1. {Step 1: what to show}
2. {Step 2: what to show}
3. {Step 3: what to show}
Save as artifacts/prds/prototype-{name}-{date}.md with status draft and type prd frontmatter.
Step 5: Build with Prototype Rules
Delegate to Engineering Agent with these constraints:
- Skip RFC -- go straight to implementation
- Skip security review
- Skip test plan generation
- Use the simplest possible architecture (monolith, SQLite, in-memory, static data)
- Hardcode what you can, mock what you must
- Focus on the happy path ONLY
- Use seed data for realistic demo state
Step 6: Prepare Demo
After build is complete:
- Load seed data (run
./tools/db/seed.sh nominalif available) - Verify all 3 acceptance criteria work in sequence
- Write the demo script (talking points for each step)
- Take screenshots of key states if applicable
Step 7: Demo Readiness Checklist
- [ ] Happy path works end-to-end for all 3 AC
- [ ] Seed data is loaded and looks realistic
- [ ] Demo script has talking points for each step
- [ ] Known limitations are documented
- [ ] No error states visible during demo flow
Step 8: Graduation Criteria
Document what is needed to graduate this prototype to a production feature:
- [ ] Full PRD with comprehensive acceptance criteria
- [ ] RFC with architecture decisions
- [ ] Security review / threat model
- [ ] Full test plan and QA
- [ ] Error handling and edge cases
- [ ] Responsive design
- [ ] Performance optimization
- [ ] Documentation
Mark these as a checklist in the mini-PRD artifact under a ## Graduation to Production section.
Quality Checklist
- [ ] Hypothesis is a single, testable sentence
- [ ] Acceptance criteria capped at 3
- [ ] Time-box selected and communicated
- [ ] Out-of-scope list is explicit
- [ ] Demo script covers all acceptance criteria
- [ ] Graduation criteria documented for production path
- [ ] Mini-PRD saved with proper artifact frontmatter
04 同仓库更多 Skills
typo-field
Fixture skill with a misspelled top-level field.
spaced-comments
Fixture skill with comments and spaces after block keys.
crlf-comments
Fixture skill with Windows line endings.
claude-fields
Fixture skill using top-level fields Claude Code documents.
workflow-router
Maps an objective to the artifacts, stages and agents it needs. Use when deciding what happens next or which agents to involve.
weekly-review
Summarizes your week: what shipped, AI spend, support themes, security health and next priorities. Use at the end of each week.