cycle
[ADD v{{VERSION}}] Plan and execute a work cycle — select features, assess parallelism, define validation
- License 许可
- MIT
- 最近更新
- 2026-10-31
- Stars
- ★ 11
- Forks
- 6
01 前言 Front Matter
- references
- [ "learning-reference.md", "swarm-protocol.md", "maturity-matrix.md", "skill-epilogue.md", "rules/telemetry.md", "rules/model-roles.md" ]
- description
- [ADD v{{VERSION}}] Plan and execute a work cycle — select features, assess parallelism, define validation
- allowed-tools
- [ "Read", "Write", "Edit", "Glob", "Grep", "Bash", "AskUserQuestion", "Task", "TodoWrite" ]
- argument-hint
- [--plan | --status | --complete | --milestone] [milestone M{N}]
02 资源文件 3
- 许可证LICENSE1.0 KB
- 参考文档SOURCE.md437 B
- 参考文档TRUST.auto.yaml2.2 KB
03 SKILL.md 正文
ADD Cycle Command v{{VERSION}}
Cycles are the operational unit of ADD work. They batch features, assess dependencies, plan parallelism, and define validation criteria before execution. This command manages the full cycle lifecycle: planning, status checks, and completion/retrospective.
Overview: What is a Cycle?
A cycle is the next batch of work before a human checkpoint. It:
- Picks features from the current milestone's hill chart
- Maps dependencies (what must serialize vs. what can parallelize)
- Assigns agents and effort estimates
- Defines per-item and overall validation criteria
- Ranges from 1-7 days depending on maturity and scope
Cycle outputs:
.add/cycles/cycle-{N}.md— the cycle plan (generated by--plan)- Updated milestone hill chart (filled in by
--statusand--complete) .add/learnings.mdcheckpoint entries (filled in by--complete)
Pre-Flight: Context & Setup
All cycle commands start by reading context:
- Read
.add/config.jsonto find current maturity level- This governs cycle scope, parallelism limits, and documentation depth
- Read active milestone from
docs/milestones/- Find the current milestone (look for
Status: IN_PROGRESS, or the most recent) - Fail gracefully if no active milestone (prompt to create one first)
- Find the current milestone (look for
- Milestone health check — after loading the active milestone, check its status:
- No active milestone (
planning.current_milestoneis null or file doesn't exist): Display "No active milestone found." Offer: run/add:milestone --listto see available milestones,/add:milestone --switch <id>to activate one, or/add:milestone --createto create a new one. STOP cycle planning until a milestone is active. - Active milestone is COMPLETE (all success criteria checked): Display "Current milestone {name} is COMPLETE." Scan
docs/milestones/for NOT_STARTED milestones. If found, suggest switching. If none, suggest creating one. STOP cycle planning until milestone is switched. - All features at DONE/VERIFIED but milestone not formally complete: Display "All features in {name} appear complete. Consider closing this milestone with
/add:cycle --completeor switching to the next one."
- No active milestone (
- Check for existing active cycle in
.add/cycles/- If one exists and last activity was < 3 days ago, assume it's still active
- Otherwise, offer to archive and start fresh
- Verify prerequisites (e.g., if POC maturity, skip some docs)
- Check for session handoff — per the Session-Handoff Preflight in
${CLAUDE_PLUGIN_ROOT}/references/skill-epilogue.md
Command: /add:cycle --plan (default)
Plan the next cycle. Interactive, human-driven, agent-assisted.
Step 1: Present the Current Milestone
Read the active milestone file and display:
- Milestone name & goal
- Hill chart (current positions)
- Features list (name, current position, spec link)
- Remaining appetite (how much time/runway is left in the milestone)
Example output:
Active Milestone: M8 — Authentication & Session Stability
Goal: Stabilize authentication system and reduce session timeout bugs by 90%
Remaining Appetite: ~5 days (started with 2 weeks, 9 days used)
Hill Chart:
Auth Overhaul ████████████████████░░░░░░░░░░░░░░░░ downhill — testing & edge cases
Session Refresh ████████████░░░░░░░░░░░░░░░░░░░░░░░░░ peak — figured out approach, starting implementation
Mobile Logout ████░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ uphill — design in progress, dependencies unclear
Feature Details:
• Auth Overhaul (specs/auth-redesign.md) — SPECCED → Target: IN_PROGRESS
• Session Refresh (specs/session-refresh.md) — SHAPED → Target: SPECCED
• Mobile Logout (specs/mobile-logout.md) — SHAPED → Target: SPECCED
Step 2: Interactive Interviews
Ask the human 1-by-1 questions. Number of questions varies by maturity (see cascade matrix in ${CLAUDE_PLUGIN_ROOT}/references/maturity-matrix.md):
- POC: ~5 questions (fast)
- Alpha: ~8 questions (clarify core unknowns)
- Beta: ~12 questions (deep understanding)
- GA: ~15 questions (exhaustive edge cases)
Core questions (all maturities):
-
"Which features should we advance this cycle?"
- Display options with current position → target position (e.g., "SPECCED → IN_PROGRESS")
- Multiple selections allowed (unless blocking dependencies prevent it)
- Suggested default: advance 1-2 features per cycle for POC, up to 3-6 for Beta/GA
-
"How long will you be available / away?"
- Days available for async agent updates? (if away: reduces autonomy, adds checkpoints)
- Impacts cycle scope: less availability = fewer features, more serialization
- Can adjust maturity "away mode autonomy" as a result
-
"Any features that must be serialized (dependencies)?"
- Auto-detect from specs (check each feature's spec for "depends on" links)
- But human can override: "Actually, Session Refresh needs Auth Overhaul to finish first"
- Build dependency graph → serialization plan
UI Gate (all maturities, UI features only):
After selecting features, check each selected feature's spec for UI components:
- Look for a non-empty Q8 answer in the spec
- OR acceptance criteria that reference screens, views, components, or flows
For each UI feature, check whether a signed-off UX artifact exists at specs/ux/{feature-slug}-ux.md with Status: APPROVED.
If a UI feature has no approved UX artifact:
At POC maturity, prompt:
{Feature name} has UI components but no signed-off design.
Options:
A) Run /add:ux specs/{feature-slug}.md now (recommended — prevents rework)
B) Skip and proceed (accepted risk — UI will be defined during implementation)
At Alpha+ maturity, block and require:
⚠ {Feature name} has UI components but no signed-off design.
Run /add:ux specs/{feature-slug}.md before including this feature in the cycle.
This gate exists to prevent implementation rework from late-breaking design changes.
Once the UX artifact is approved, re-run /add:cycle --plan.
If all UI features have approved artifacts (or no features have UI), continue without interruption.
Additional questions (Alpha+):
-
"What's blocking or at-risk?" — tap the milestone's risk table; any mitigations to pursue this cycle?
-
"Are there edge cases we should focus on?" — especially for downhill features (near VERIFIED); do we need QA or performance testing?
Additional questions (Beta+):
-
"Who's reviewing this cycle? Any availability constraints?" — Beta requires code review; GA requires 2 reviewers
-
"Should we do a pre-deploy sanity check?" — Beta/GA requires pre-deploy QA
-
"Do any features need performance testing?" — common in Beta/GA for downhill features
-
"What's the rollback plan if things go sideways?" — GA especially needs this upfront; feature flags? database migration reversibility?
Additional questions (GA):
-
"Is there a customer impact window we should avoid?" — peak usage hours to avoid deployments?
-
"Should we split this cycle into two smaller ones?" — GA favors smaller, more frequent cycles (less risk)
-
"Are there compliance or audit implications?" — any regulatory review needed before merge?
-
"What's our monitoring/alerting strategy?" — how will we detect failures post-deploy?
-
"Do we need a communication plan to customers?" — feature deprecation? beta label? known issues?
Step 3: Assess Parallelism
Based on answers, determine what can run in parallel:
-
Build dependency graph:
- "Session Refresh needs Auth Overhaul to finish" → serialization edge
- "Mobile Logout is independent" → can run parallel to the others
- Visualize:
Auth Overhaul → Session Refresh,Mobile Logout (parallel)
-
Check maturity parallelism limits:
- POC: 1 serial agent (no parallelism)
- Alpha: 1-2 agents (minimize coordination)
- Beta: 2-4 agents (with file reservations)
- GA: 3-5 agents (strict coordination, merge sequence)
-
Recommend agent allocation:
- "Feature A (Auth Overhaul) → Agent 1"
- "Feature B (Session Refresh) → Agent 1 (waits for Feature A) or Agent 2 if available?"
- "Feature C (Mobile Logout) → Agent 2 or Agent 3 (independent)"
-
Plan file reservations (Beta/GA):
- Which agent owns which files?
- Example:
Agent 1: src/auth/*, src/session/*+Agent 2: src/mobile/logout/* - Avoids merge conflicts, enables parallel work without constant rebasing
-
Define merge sequence (Beta/GA):
- Which feature merges first?
- Usually: infrastructure first, then dependent features
- Example:
Auth Overhaul → Session Refresh → Mobile Logout
Step 4: Generate Cycle Plan
Create .add/cycles/cycle-{N}.md from ${CLAUDE_PLUGIN_ROOT}/templates/cycle-plan.md, filling every section (work items, dependencies & serialization, parallel strategy, validation criteria, autonomy & checkpoints, notes) with the answers from Steps 1-3.
Depth varies by maturity:
- POC: Minimal (just work items + serial note)
- Alpha: Brief (work items, dependencies, validation)
- Beta: Full (all sections, parallel strategy, risks)
- GA: Exhaustive (all sections, merge sequence, monitoring plan, rollback strategy)
Command: /add:cycle --status
Check the progress of the active cycle in real-time.
Step 1: Read Active Cycle
Load .add/cycles/cycle-{N}.md (most recent or explicitly named).
Step 2: Scan Feature Positions
For each work item in the cycle:
- Check the spec (e.g.,
specs/auth-redesign.md)- How many acceptance criteria are marked done?
- Any open TODOs or questions?
- Check test status
- Run test suite, capture pass/fail rate
- Estimate % complete based on passing tests
- Check PR status (if applicable)
- Is code up for review? Approved? Merged?
Step 3: Update Hill Chart
Move each feature's position on the milestone's hill chart:
- Still doing discovery? → still "uphill"
- Tests written, waiting on implementation? → "peak"
- Code mostly done, in review/QA? → "downhill"
Example:
Auth Overhaul ████████████████████████░░░░░░░░░░ downhill — 4/5 tests passing, PR in review
Session Refresh ████████████████░░░░░░░░░░░░░░░░░░░░ peak — spec finalized, starting TDD cycle
Step 4: Report Status
Display:
- What's done: Features at/past target position
- What's in progress: Features making progress, ETA
- What's blocked: Features not advancing, reason
- Overall cycle progress: % of validation criteria met
- Suggestion: If all criteria met, suggest
/add:cycle --complete
Example report:
Cycle 8 Status (as of 2026-02-07)
✅ Auth Overhaul: SPECCED → IN_PROGRESS (on track)
• 4/5 acceptance criteria passed in tests
• PR #142 in review (1 comment pending)
• ETA: ready for merge tomorrow
? Session Refresh: SHAPED → SPECCED (in progress)
• Spec 80% written, mobile device edge case TBD
• Waiting on dependency: Auth Overhaul merge
• ETA: spec done by EOD Friday
✅ Mobile Logout: SHAPED → SPECCED (on track)
• Spec complete and approved
• Ready to start implementation cycle-9
---
Cycle Validation:
• All features reached target position? 1/3 (Auth in progress, others specced)
• All acceptance criteria met? 4/5 (Auth downhill, others still uphill)
• Code review completed? Yes (Auth in progress)
• Pre-deploy QA passed? Pending
Overall: 67% complete. On track to finish by cycle end.
Suggestion: Continue cycle, target completion by 2026-02-09.
Command: /add:cycle --complete
Close the active cycle. Verify validation, update milestone, capture learnings.
Step 1: Verify Cycle Validation Criteria
Check:
- [ ] All work items reached target position
- [ ] All per-item acceptance criteria verified
- [ ] Code review completed (if required by maturity)
- [ ] Pre-deploy QA passed (if required by maturity)
- [ ] No critical blockers or regressions
If any fails, don't complete. Report blockers and ask human to decide:
- Extend cycle to finish remaining work?
- Archive cycle as-is and start fresh cycle with leftover work?
- Downgrade some features (target positions)?
Step 2: Update Milestone Hill Chart
Move all features to their new positions in docs/milestones/M{X}-{name}.md:
- Update hill chart percentages
- Update feature detail table (Position column)
- Mark cycle completion in cycle tracking table
Example:
| cycle-8 | Auth Overhaul (SPECCED→IN_PROGRESS), Session Refresh (SHAPED→SPECCED), Mobile Logout (SHAPED→SPECCED) | COMPLETE | All features on track. Auth ready for QA next cycle. |
Step 3: Check Milestone Success Criteria
Now that cycle is done, did the milestone's success criteria improve?
- "All authentication specs passing in staging" → Is this now true?
- "Zero authentication-related bugs for 7 days" → How are we trending?
If milestone success criteria are now fully met, suggest milestone closure.
Maturity Promotion Check (evidence-based)
If milestone completion triggers a promotion suggestion, run an evidence scan before recommending it. Promotion requires evidence, not aspiration. The evidence items, scoring thresholds per transition, and promotion process are defined in ${CLAUDE_PLUGIN_ROOT}/references/maturity-matrix.md — /add:promote --check is the canonical gap-analysis tool.
If evidence supports promotion:
Milestone M{N} complete. Evidence supports maturity promotion:
Current: {ALPHA}
Evidence score: {7}/10
Recommendation: Promote to {BETA}
Run /add:retro to formally promote (updates config, activates new rules).
If evidence does NOT support promotion: report the score, list the gaps for the target level, and suggest reassessing at the next /add:retro.
Do NOT auto-promote. Promotion is applied through /add:retro which updates config and records the change.
Step 4: Archive Cycle & Checkpoint
Write a structured JSON learning entry to the appropriate learnings file. Follow the checkpoint process in ${CLAUDE_PLUGIN_ROOT}/references/learning-reference.md (section: "How to Write a Checkpoint Entry"):
- Classify scope — cycle retrospective insights are typically
projectscope (specific to this project's milestone), but process insights may beworkstationoruniversal - Write JSON entry with:
checkpoint_type:"retro"(cycle completion is a mini-retro)category:"process"title:"Cycle {N} complete: {summary}"body: Include cycle metrics (duration, features advanced, validation success, blockers), what worked, what was harder, and learnings for next cycle
- Regenerate the markdown view
If the cycle produced multiple distinct learnings (e.g., a technical discovery AND a process insight), write separate entries with appropriate scope classification for each.
Step 5: Present Next Options
After completing a cycle:
- If milestone is incomplete: Offer to plan the next cycle (
/add:cycle --plan) - If milestone is complete: Offer to close the milestone (
/add:milestone --closeor similar) - If promotion is ready: Highlight maturity promotion path
Example:
Cycle 8 complete! ✅
Milestone M8 progress:
• Goal: Stabilize authentication & reduce session timeout bugs by 90%
• Success Criteria: 5/5 met (all specs passing, 0 bugs for 7 days, mobile parity confirmed)
• Status: READY TO CLOSE
Recommendation: Complete milestone M8, then run /add:retro to assess evidence-based promotion.
Options:
/add:milestone --close M8
/add:retro M8 (write retrospective, assess promotion)
/add:cycle --plan M9 (plan next milestone's first cycle)
Command: /add:cycle --milestone
Select a milestone before planning. Convenience shortcut that runs milestone selection inline, then continues to --plan.
Step 1: List Available Milestones
Glob docs/milestones/M*.md. Display table with Status, Horizon, Features, Completion %, Target Maturity. Highlight current active milestone.
Step 2: Ask for Selection
"Which milestone should we plan the next cycle for?"
Accept milestone ID (e.g., M3-marketplace-ready or M3). Validate it exists and is not COMPLETE.
Step 3: Switch if Needed
If selection differs from planning.current_milestone:
- Run the same switch logic as
/add:milestone --switch(safety checks, config update) - Update
planning.current_milestoneandplanning.current_cyclein config
Step 4: Continue to --plan
Proceed with normal /add:cycle --plan flow using the newly active milestone.
Swarm Coordination (Beta/GA Maturity)
When the cycle plan includes parallel work with 2+ agents, follow the full protocol in ${CLAUDE_PLUGIN_ROOT}/references/swarm-protocol.md — worktree setup, file reservation maps, merge sequencing, and coordination rules all live there.
Cycle-specific notes:
- Every dispatch carries a MODEL tier and a BUDGET cap per the policy tables in
${CLAUDE_PLUGIN_ROOT}/references/swarm-protocol.md(Resource Budgets + role → tier defaults, tiers perrules/model-roles.md). Mechanical work — frontmatter sweeps, generated-output regen, dashboard/SVG rendering — runs on the fast tier; reserve the architect tier for review and orchestration. - The cycle plan's File Reservations and Merge Sequence sections (from the cycle-plan template) are the swarm's ownership map for this cycle. Each agent owns their reserved paths — no cross-agent edits without coordination.
- WIP limits: Beta allows 3-6 features per cycle (strict focus); GA adds explicit per-agent WIP limits (e.g., Agent-1: max 2 concurrent features). If the cycle plan exceeds limits, split into smaller cycles. Smaller is better for quality and coordination.
Catch-Up Spike: Adoption Mode
When /add:cycle is called on a project newly adopting ADD, detect the gap and hand off to /add:init's adoption mode rather than duplicating it here.
Detection — any of:
- No
.add/cycles/directory exists - No active milestone found
- Project maturity is "unspecified"
Then offer:
This project isn't yet structured for ADD cycles.
Run /add:init to bootstrap ADD adoption — it performs the gap analysis,
generates retroactive specs and a baseline catch-up milestone (M0), and
sets up quality gates and commit discipline.
Once /add:init completes, run /add:cycle --plan M0 to execute the
catch-up work in 1-2 intensive cycles, then resume normal cycles for M1+.
Summary: Cycle Command Cheat Sheet
| Command | Purpose | Output |
|---|---|---|
/add:cycle --plan |
Plan next cycle (interactive) | .add/cycles/cycle-{N}.md |
/add:cycle --status |
Check cycle progress | Report + updated hill chart |
/add:cycle --complete |
Close cycle + update milestone | Archived cycle + learnings checkpoint |
/add:cycle --milestone |
Select milestone before planning | Config update + cycle plan |
/add:cycle --plan M0 |
Catch-up spike (new projects) | Catch-up milestone + cycle plan |
Key principles:
- Maturity drives behavior. POC cycles are fast & simple. GA cycles are detailed & checkpointed.
- Cycles are the execution heartbeat. Plan them with humans, execute with agents, verify together.
- Parallelism is intentional. Only when maturity + dependencies allow. File reservations prevent thrashing.
- Learnings are captured. Every cycle checkpoint feeds the next planning round.
End-of-skill epilogue: follow ${CLAUDE_PLUGIN_ROOT}/references/skill-epilogue.md (observation + learning checkpoint + progress tracking).
04 同仓库更多 Skills
add-verify
暂无简介
add-verify
暂无简介
add-verify
暂无简介
version
[ADD v0.11.0] Show installed version, project version, and upgrade status
verify
[ADD v0.11.0] Run quality gates — lint, types, tests, coverage, spec compliance
ux