AGENT SKILL

test-normalize

Repair and standardize a testing regime through concrete file plans, guarded deployment receipts and repeatable verification of runner and oracle behavior.

License 许可
MIT
所属仓库
jmagly/aiwg
最近更新
2026-11-12
Stars
★ 229
Forks
36

01 前言 Front Matter

name
test-normalize
version
2.0.0
namespace
aiwg
platforms
[ "all" ]
description
Repair and standardize a testing regime through concrete file plans, guarded deployment receipts and repeatable verification of runner and oracle behavior.

02 资源文件 5

03 SKILL.md 正文

Test normalization

Start from an evidence-backed assessment or a confirmed individual finding. For an unaudited whole testing regime, run test-conformance first. Use the normalization plan template and the workflow.

Select a finite batch and write the intended behavioral acceptance condition. Prioritize fail-open validators, omitted tests and ineffective gates before cosmetic fixture conventions. Existing authorized cleanup covers necessary reversible edits; ask only when a concrete step is outside that authorization.

Inspect templates --action list for a suitable platform bundle. Use templates --action develop to produce a custom editable bundle when needed, then validate and review it. templates --action deploy plans/applies platform files through the same ownership and receipt rules; provider addon deployment and target test configuration deployment are separate operations.

Prepare explicit {path, content} edits; content: null means intentional deletion. Run plan to capture complete before/after state. Review its actual paths and changed behavior, then apply within the authorized scope. Preserve the receipt; changed hashes or receipt collisions require investigation and a new plan, not a forced write. No arbitrary shell commands belong inside an edit plan.

Run the affected tests and discovery, negative controls, and declared wider verification. Update source-bound reviews and regenerate the assessment/report. If the batch causes a regression, use rollback only while its receipt and post-apply state remain valid. A partial transaction requires inspection and a fresh recovery plan; rollback refuses unrelated drift.

Repeat with a new plan and a stated finite batch budget. Stop on conformance, an unresolved external prerequisite, or budget exhaustion; report remaining findings. Do not silence tests, reduce thresholds or remove required checks to satisfy the gate. A normalization template standardizes a convention; its successful deployment alone does not prove real tests.

04 同仓库更多 Skills